FIELD: civil engineering; construction of bridges. SUBSTANCE: in crossing a stream flow, a road has an embankment with slopes, having two tiers, the lower of which is built on the frozen ground core and an artificial (man-made) structure, having a foundation disposed within the boundaries of the embankment. The upper surface of the lower tier has the form of a platform, which is convex in plan. Mean distance from the foundation center to the platform boundary is calculated from a formula. EFFECT: enhanced reliability and long term usability under permafrost conditions of the structure. 10 dwg
Title | Year | Author | Number |
---|---|---|---|
BRIDGE-TYPE PASSING ON PERMAFROST | 1993 |
|
RU2039146C1 |
BRIDGE PIER | 1999 |
|
RU2164270C1 |
EARTH STRUCTURE OF PERMAFROST SOILS | 0 |
|
SU1664973A1 |
BRIDGE PASSAGE ON PERMAFROST | 1988 |
|
SU1552707A1 |
ROAD EMBANKMENT WITH DRAINAGE GROOVE | 2003 |
|
RU2245965C1 |
REINFORCED DRAINING COMPOSITE GEOTEXTILE MATERIAL | 1995 |
|
RU2103439C1 |
ARCH-TYPE FILLED BRIDGE | 2003 |
|
RU2236498C1 |
ROAD EMBANKMENT BUILT ON PERMAFROST GROUND | 2004 |
|
RU2256032C1 |
METHOD FOR CONSTRUCTION OF APPROACH EMBANKMENT TO BRIDGE PIERS ON PERMAFROST GROUNDS | 1997 |
|
RU2120518C1 |
WATER DRAINAGE DITCH | 2003 |
|
RU2245957C1 |
Authors
Dates
1995-05-20—Published
1992-10-13—Filed