FIELD: bridge engineering. SUBSTANCE: pier primarily meant for use under severe climate conditions has footing formed by one or more pillars, section under the truss made in the form of ledge supporting the bridge span through bearing parts, box section, and embankment of approach zone.. Novelty is that section under the truss and box section are installed separately and spaced apart through distance equal to expansion clearance plus 1-2 cm; box section is essentially abutment wall whose thrust surface is turned to face bridge span, horizontal bearing floor rests on ground floor. EFFECT: improved economic efficiency of pier. 3 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
BRIDGE-TYPE PASSING ON PERMAFROST | 1993 |
|
RU2039146C1 |
METHOD FOR CONSTRUCTING A ROAD ACROSS A STREAM FLOW ON THE PERMAFROST GROUND | 1992 |
|
RU2035537C1 |
END MOST ABUTMENT OF BRIDGE CROSSING FROM WELDED TUBULAR RABBET WITH FUNCTION OF RETAINING WALL | 2013 |
|
RU2543390C2 |
TUNNEL TYPE BRIDGE | 2005 |
|
RU2269618C1 |
METHOD FOR BEAM BRIDGE RECONSTRUCTION (VARIANTS) | 2004 |
|
RU2271417C1 |
REINFORCED DRAINING COMPOSITE GEOTEXTILE MATERIAL | 1995 |
|
RU2103439C1 |
BRIDGE ABUTMENT | 2022 |
|
RU2808016C1 |
CONJUNCTION OF BRIDGE AND EMBANKMENT | 1999 |
|
RU2136809C1 |
BRIDGE PIER | 0 |
|
SU1152994A1 |
STRUCTURE FOR COUPLING OF WOOD-AND-REINFORCED CONCRETE SPAN WITH BRIDGE ABUTMENT | 2008 |
|
RU2374383C1 |
Authors
Dates
2001-03-20—Published
1999-06-29—Filed