FIELD: construction, in particular, foundations for high-voltage transmission lines, crane track column foundation, smoke stack foundations and water tower foundations. SUBSTANCE: pile foundation has grillage 1, paired piles 2 and 3, tie-rods 4 and 5 for connecting piles 2 with piles 3. Tie-rods 4 and 5 are prestressed and provided with flexible compensators 6 and 7, for example springs and packs of springs. EFFECT: wider operational capabilities, simplified construction and enhanced reliability in operation. 2 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
PILE FOUNDATION AND METHOD FOR ERECTION THEREOF | 0 |
|
SU1827412A1 |
DEVICE FOR REINFORCING FOUNDATIONS OF BUILDINGS AND STRUCTURES AND METHOD FOR ERECTING THE DEVICE FOR REINFORCING FOUNDATIONS OF BUILDINGS AND STRUCTURES | 1993 |
|
RU2068916C1 |
DEVICE FOR REINFORCING FOUNDATIONS OF THE EXISTING BUILDINGS AND STRUCTURES | 1993 |
|
RU2074287C1 |
PILE FOUNDATION | 0 |
|
SU1521832A1 |
METHOD FOR STRAIGHTENING OF SLANT IN BUILDING ERECTED ON PILE FOUNDATION | 2008 |
|
RU2382146C1 |
PILE FOUNDATION | 0 |
|
SU1404594A1 |
PILES FOUNDATION | 0 |
|
SU1102854A1 |
METHOD TO INCREASE BEARING CAPACITY OF BORED PILE | 2012 |
|
RU2509842C2 |
SINKING STRUCTURE AND METHOD FOR ERECTION THEREOF | 1991 |
|
RU2013554C1 |
CORRECTION METHOD OF INCLINATION AND NON-UNIFORM SETTLEMENT OF LARGE HIGH-RISE STRUCTURE AND ITS FOUNDATION | 2010 |
|
RU2436899C1 |
Authors
Dates
1995-06-09—Published
1991-12-18—Filed