FIELD: civil engineering. SUBSTANCE: method to reinforce construction, building foundation includes sectional caving in piles through openings in the center of foundation plate. The piles are jacked in up to a proper value of soil resistance. The jack is installed in a niche pierced in wall. Insertion pieces are installed in walls where niches are located, or niches are filled with material of low strength with further withdrawal of the material when the foundation is being built. The jack is fixed through tie- rods to assembly hinges of foundation plate. Then the last section of a pile is fixed to foundation plate, and the jack is dismantled. EFFECT: high productivity. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO REINFORCE EXISTENT BUILDING AND BUILDING STRUCTURE FOUNDATION | 2006 |
|
RU2319809C1 |
METHOD FOR REDUCING DIFFERENCE IN SETTLEMENT DURING BUILDING CONSTRUCTION | 2004 |
|
RU2265107C1 |
METHOD OF ERECTING FOUNDATION | 2016 |
|
RU2626479C1 |
METHOD OF STRIP FOOTING REINFORCEMENT | 2011 |
|
RU2472900C1 |
METHOD FOR REINFORCING FOUNDATION OF BUILDING OR INSTALLATION | 0 |
|
SU1008357A1 |
METHOD FOR CONSTRUCTION OF PILE FOUNDATION | 2015 |
|
RU2581853C1 |
0 |
|
SU1784058A3 | |
COMBINED (PILE-SLAB, PILE-BELT, PILE-COLUMNAR) FOUNDATION ERECTION METHOD | 2015 |
|
RU2667163C2 |
METHOD OF STRENGTHENING FOUNDATION AT RECONSTRUCTION | 2016 |
|
RU2633619C1 |
METHOD OF REINFORCEMENT OF BUILDING FOUNDATION AND DEVICE FOR ITS EMBODIMENT | 2001 |
|
RU2191235C1 |
Authors
Dates
1995-06-19—Published
1991-09-25—Filed