FIELD: mining. SUBSTANCE: method for reconstruction of flooded open pits includes overburden mining with application of drilling and blasting operations for rock breaking. Draining brines coming to open pit bottom are partially pumped out of pit. Part of overburden is transported to external dumps and argillaceous rocks of overburden are filled into worked-out space to bottom of flooded open pit. Volume of rocks filled into internal dump should be large enough to overlap water-bearing collector through the calculated height. Further mining of overburden is carried out under protection of filled curtain. After construction of impervious curtain, internal dump rocks are transported beyond its outline and reconstruction of open pin is continued. EFFECT: higher efficiency. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF COMBINED MINING OF FLOODED MINERAL DEPOSITS | 1999 |
|
RU2165018C2 |
METHOD OF STORING AND STORAGE OF SALINE ROCKS IN PERMAFROST REGIONS | 1998 |
|
RU2150581C1 |
METHOD FOR ESTABLISHMENT OF IMPERVIOUS CURTAIN IN PERMAFROST ROCKS OF CRYOLITOZONE | 1991 |
|
RU2029091C1 |
METHOD OF CHECKING BURIAL OF DRAIN WATERS IN PERMAFROST | 1994 |
|
RU2061635C1 |
METHOD OF MINING OF STEEPLY DIPPING DEPOSITS OF WORKING OF DEEP HORIZONS OF OPENCAST | 2001 |
|
RU2187648C1 |
METHOD FOR COMPLETION OF OPEN PIT WITH TWO CLOSELY LOCATED ORE BODIES | 2013 |
|
RU2540735C1 |
METHOD FOR BENCH MINING OF ROCK MASS IN STEEPLY DIPPING MARGINAL ZONE | 1987 |
|
RU1478774C |
METHOD FOR EXTRACTION OF HARD MINERAL RESOURCES FROM DEEP-LYING WATER-FLOODED DEPOSIT | 2011 |
|
RU2459082C2 |
METHOD FOR SELECTIVE MINING OF DIAMOND ORES | 1990 |
|
RU2009318C1 |
METHOD OF FORMATION OF OPENCAST NONMINING FLANK IN ARGILLACEOUS ROCKS | 2001 |
|
RU2208163C1 |
Authors
Dates
1995-07-09—Published
1992-08-17—Filed