FIELD: mechanical engineering. SUBSTANCE: first, end gate is assembled and prepared; then gate provided with technological branch pipe is welded to housing of chamber. After assembly, gate is welded to hydraulic test stand. Upon completion of tests, gate is cut off stand and ends of branch pipe are prepared for welding at the Manufacturing plant. Welding the branch pipe to housing is effected under field conditions. Diameter of branch pipe shall correspond to diameter of chamber and its length shall be no less than 400 mm. EFFECT: enhanced reliability. 2 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR TESTING PIPES | 2002 |
|
RU2247957C2 |
METHOD OF PRODUCING END VALVES | 2004 |
|
RU2280807C2 |
DEVICE FOR DISPATCHING AND RECEIVING FLUIDS IN PIPELINE | 1996 |
|
RU2103596C1 |
DEVICE FOR DISPATCHING AND RECEIVING FLUIDS IN PIPELINE | 1997 |
|
RU2103597C1 |
SHUT-OFF VALVE | 1994 |
|
RU2091652C1 |
ROLLED SHEET PRODUCTION METHOD | 1996 |
|
RU2093288C1 |
FAST SHUTTER | 2007 |
|
RU2339860C1 |
METHOD OF REPAIR OF DEFECTS IN PIPE LINE | 1997 |
|
RU2133401C1 |
TANK RECEIVING-AND-DISPENSING DEVICE | 2001 |
|
RU2191730C1 |
QUICK-ACTING GATE VALVE | 2006 |
|
RU2295081C1 |
Authors
Dates
1995-07-20—Published
1994-03-22—Filed