FIELD: oil industry.
SUBSTANCE: method comprises assembling the unit composed of shell whose length is at least equal to the sum of the lengths of the shells of two end valves, two flanges, and assembling parts. The flanges are welded to the both flanges of the shell, and their sealing surface are finished. The unit is connected with the bench for hydraulic test by means of temporal branch pipes. The assembling parts are set on the flanges alternatively. After hydraulic test and pressure relief, the end shell is cut into two end valves.
EFFECT: enhanced safety and reduced labor consumption.
5 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF ASSEMBLY OF RECEIVING AND STARTING CHAMBERS OF FLOW DEVICES INTO PIPE LINES | 1994 |
|
RU2039904C1 |
METHOD OF MAKING HIGH-PRESSURE WELDED VESSELS | 2012 |
|
RU2510784C1 |
TEST BENCH FOR INTERNAL PRESSURE TESTING OF DEEPWATER APPARATUS MODULES | 2019 |
|
RU2701756C1 |
BALL VALVE-CONDENSATE COLLECTOR | 2006 |
|
RU2327073C1 |
METHOD FOR ASSEMBLING OF SHELL-AND-TUBE HEAT EXCHANGER | 2005 |
|
RU2284889C1 |
METHOD AND PRODUCTION LINE FOR MAKING DOUBLE-WALL CASING PIPES FROM SECTIONS | 0 |
|
SU1214258A1 |
CORROSION PROTECTION METHOD FOR WELD JOINT OF PIPES WITH INNER COATING AT PIPELINE CONSTRUCTION | 2013 |
|
RU2522739C1 |
METHOD OF MANUFACTURING BLANKS OF SECTORS WITH SHOULDERS FOR TIRE CASING ASSEMBLY DRUMS (VERSIONS) | 1999 |
|
RU2161559C2 |
METHOD OF LINE PRODUCTION OF MULTILAYER TUBES | 0 |
|
SU1269903A1 |
METHOD FOR MANUFACTURING WELDED THIN-WALLED CONICAL PART CONSISTING OF SHELL AND BODY PARTS WELDED TO IT ALONG ANNULAR JOINTS | 2020 |
|
RU2748843C1 |
Authors
Dates
2006-07-27—Published
2004-05-17—Filed