FIELD: civil engineering. SUBSTANCE: steel portion of the bridge is installed first, then it is concreted. Profiled sheet steel is used as steel portion. Concreting is made by spraying concrete on one or both surfaces of the profiled sheet. EFFECT: high technological effectiveness. 1 cl, 27 dwg
Title | Year | Author | Number |
---|---|---|---|
BRIDGE SPAN STRUCTURE ERECTION METHOD | 2005 |
|
RU2280121C1 |
SHUTTERING FOR WALLS | 1993 |
|
RU2107789C1 |
RIBBED SLAB OF PANEL COVERING | 1993 |
|
RU2103453C1 |
BRIDGE SPAN STRUCTURE | 2005 |
|
RU2280122C1 |
METHOD FOR MANUFACTURING CONCRETE COLUMNS AND BEAMS | 0 |
|
SU1809804A3 |
CONSTRUCTIONAL MEMBER | 1991 |
|
RU2039175C1 |
REINFORCED CONCRETE VOLUMETRIC BLOCK AND METHOD FOR ITS MANUFACTURE | 2022 |
|
RU2781969C1 |
BUILT-UP BRIDGE BEAM AND BRIDGE ROAD | 1995 |
|
RU2100523C1 |
METHOD OF RECONSTRUCTION OF THE BRIDGE SPAN STRUCTURE WITH METALLIC DOUBLE-CANTILEVER ARCH | 2018 |
|
RU2689009C1 |
CONSTRUCTION COVERING | 1990 |
|
RU2095251C1 |
Authors
Dates
1995-08-09—Published
1992-03-25—Filed