FIELD: bridge building.
SUBSTANCE: invention relates to the field of bridge building, namely to reconstruction of bridge structure, covering combination of longitudinal and transverse reinforcement. Method of complex reconstruction of bridge structure 1, includes truss system 2 of longitudinal reinforcement and additionally hinged joint on plate 11, which together provide operation along full length of entire span 5 and along vertical in full section. Pre-formed are concrete segments with pipes in lower part 6 in inter-beam space 7, concrete segments with pipes in upper part 8 in above-support zones 9. After that, from one side of span 5, bundles of strands 3 are passed into pipes of concrete segments 8 in above support zones 9, then into pipes of concrete segments 6 in inter-beam space 7, further into pipes of concrete segments 8 of next support zones 9 and in such sequence to end of span 5. Then bundles of strands 3 are fixed on one side of span 5 with anchor elements 10, and bundles of strands 3 are stretched on opposite side of span 5 and fixed with anchor elements 10. Beams 4 are hinged in pairs along the bridge structure at the level of the plate of span. In above-support zones 9 above inter-beam space 7 formwork 15 is installed, then metal reinforcing frame in form of mesh 13 is installed. After that, the formwork with reinforcing frame 13 is concreted with fibre-reinforced concrete and fixed to the beams with anchors 14.
EFFECT: increased durability of bridge structure.
1 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF SPRENGEL REINFORCEMENT OF SPAN STRUCTURE | 2023 |
|
RU2804484C1 |
REINFORCEMENT METHOD OF A BRIDGE STRUCTURE WITH DISMANTLING OF BRIDGE CHANNEL SUPPORTS | 2019 |
|
RU2712984C1 |
MONOLITHIC SOLID PRESTRESSED PLATE-AND-RIB BRIDGE SPAN STRUCTURE | 2004 |
|
RU2249068C1 |
METHOD OF RECONSTRUCTION OF THE BRIDGE SPAN STRUCTURE WITH METALLIC DOUBLE-CANTILEVER ARCH | 2018 |
|
RU2689009C1 |
METHOD FOR TRANSFER OF LONG-SPAN STEAM-AND-WATER MIXTURE DELIVERY PIPELINE OVER CANYON LOCATED IN SEISMICALLY ACTIVE ZONE | 2023 |
|
RU2815705C1 |
CONSTRUCTION METHOD FOR BRIDGE OR OVERPASS | 2002 |
|
RU2251604C2 |
CONSTRUCTION METHOD AND DESIGN OF OVERPASSES AND BRIDGES UNDER CONDITIONS OF PERMAFROST | 2012 |
|
RU2513574C2 |
METHOD FOR CYCLIC MOVEMENT OF SOLID REINFORCED CONCRETE BRIDGE SPAN IN LONGITUDINAL DIRECTION | 2004 |
|
RU2242559C1 |
MOTOR ROAD BRIDGE WITH CONTINUOUS REINFORCED CONCRETE SPAN STRUCTURES AND METHOD OF ERECTION THEREOF | 2004 |
|
RU2275451C2 |
METHOD FOR STRENGTHENING THE BRIDGE SUPERSTRUCTURE | 2016 |
|
RU2640855C1 |
Authors
Dates
2024-09-30—Published
2024-02-20—Filed