FIELD: construction. SUBSTANCE: prior to erection of walls of the under- ground structure, a zone of loose ground is formed to the depth of the structure to be constructed. A supporting prism from a sand-gravel mix is set up along the structure outline. After erection a sheet-piling is pressed in the ground mass on the day surface of the structure walls between them and existing buildings, using the erected structure walls as supporting constructions for pressing-in. Then a curtain of clay mortar is set up between the structure to be constructed and sheet-piling. Then dipping of the structure walls is started with simultaneous even destruction of the supporting prism from the sand-gravel mix. EFFECT: prevention of ground migration from under foundations of existing buildings at construction in restricted urban conditions. 3 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF CONSTRUCTION OF UNDERGROUND STRUCTURE | 2022 |
|
RU2800171C1 |
METHOD OF UNDERGROUND STRUCTURE ERECTION IN URBAN BUILT-UP AREA | 2002 |
|
RU2245966C2 |
METHOD FOR CONSTRUCTION OF UNDERGROUND STRUCTURE | 2012 |
|
RU2486318C1 |
METHOD FOR CREATING AN ANTI-FILTRATION SAND-SAPROPEL CURTAIN | 2021 |
|
RU2778149C1 |
METHOD OF UNDERGROUND STRUCTURE ERECTION IN URBAN BUILT-UP AREA | 2002 |
|
RU2245428C2 |
METHOD FOR ARRANGEMENT OF PIT SIDES BARRIERS IN SATURATED SOILS | 2009 |
|
RU2404327C2 |
METHOD TO MAINTAIN INITIAL STRESSED-DEFORMED CONDITION OF SOIL IN ZONE OF EXISTING BUILDING FOUNDATION | 2010 |
|
RU2422592C1 |
MULTI-LAYER HYDRAULIC INSULATION OF UNDERGROUND STRUCTURE (DEVICE BY P.B. YURKEVICH) | 2013 |
|
RU2539456C2 |
METHOD OF ERECTION OF SLAB REINFORCED CONCRETE FOUNDATION | 2018 |
|
RU2692396C1 |
BANK PROTECTION WAVE SUPPRESSOR AND METHOD FOR ITS ERECTION | 1994 |
|
RU2095516C1 |
Authors
Dates
1995-08-20—Published
1994-01-19—Filed