FIELD: civil engineering. SUBSTANCE: underground structure includes at least one tunnel with lining having at least one aperture with a framework. The lining is made in the form of external and internal metallic extended shells with anchor- like fixtures on surfaces facing one another and a layer of hardening material between the shells, where anchor-like fixtures are placed in. The shells are apart form one another. Metallic diaphragms are located along aperture contour. The diaphragms overlap the layer of hardening material, are rigidly fastened to the shells, and form aperture framework along with lining sections adjoining aperture from any side. External and internal metallic extended shells with anchor-like fixtures are used in constructing underground structure. The one shells are installed inside others at a distance along structure length when erecting. Metallic diaphragms are placed in the space between the shells. EFFECT: building deep-seated structures. 2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ERECTING A THREE-SPAN METRO STATION WITH A DOUBLE-TRACK MIDDLE STATION TUNNEL AND SIDE STATION HALLS WITH PASSENGER PLATFORMS | 2022 |
|
RU2779168C1 |
METHOD FOR ERECTING DEEP SUBWAY STATION | 1993 |
|
RU2061148C1 |
METHOD FOR ERECTION OF THREE-VANE SUBWAY STATION OF CLOSED METHOD OF PERFOMING WORKS WITH DOUBLE-TRACK MAIN LINE TUNNEL | 2019 |
|
RU2704414C1 |
METHOD FOR ERECTION OF THREE-VAULT SUBWAY STATION OF CLOSED METHOD FOR PRODUCTION OF PYLON TYPE WORKS | 2020 |
|
RU2729474C1 |
DOUBLE-VAULTED PYLON SUBWAY STATION, CONSTRUCTED BY TRENCHLESS METHOD | 2019 |
|
RU2735506C1 |
MOVABLE CONCRETE FORM FOR CONCRETING FLOORS | 1994 |
|
RU2061181C1 |
THREE-VAULT METRO STATION OF CLOSED METHOD FOR PRODUCTION OF PYLON TYPE WORKS | 2019 |
|
RU2715493C1 |
METHOD OF CONSTRUCTION OF DEEP-SEATED SUBWAY STATION | 1993 |
|
RU2082883C1 |
METHOD FOR CONSTRUCTING A THREE-SPAN SUBWAY STATION OF AN OPEN METHOD OF PERFORMING WORKS WITH A LATERAL ARRANGEMENT OF PASSENGER PLATFORMS AND A DOUBLE-TRACK STILL TUNNEL | 2018 |
|
RU2692518C1 |
PROCESS OF CONSTRUCTION OF CONTIGUITY OF TRANSFER TUNNEL OF BUILT LINE OF UNDERGROUND RAILWAY TO TRANSFER TUNNEL OF OPERATIONAL LINE | 1994 |
|
RU2057939C1 |
Authors
Dates
1995-09-27—Published
1993-12-29—Filed