DOUBLE-VAULTED PYLON SUBWAY STATION, CONSTRUCTED BY TRENCHLESS METHOD Russian patent published in 2020 - IPC E02D29/00 

Abstract RU 2735506 C1

FIELD: construction.

SUBSTANCE: invention relates to construction, particularly, to construction of pylon-type deep-lying subway stations. Double-vane pylon subway station constructed by closed method includes two non-crossing tunnel tunnels made of circular outline tubing, in each of which there are rail track structures and passenger landing platforms, under which technical rooms are located. Between the station tunnels there are openings for passengers’ passage. Frames of openings are made in the form of monolithic reinforced concrete frames, contact of which during their concreting forms passages for passengers between platforms in station tunnels, wherein lining of station tunnels is made of reinforced concrete tubings.

EFFECT: technical result consists in reduction of volume of underground earth and reinforced concrete works, improvement of manufacturability, reliability and speed of construction of pylon-type subway stations constructed by closed method of works.

1 cl, 2 dwg

Similar patents RU2735506C1

Title Year Author Number
THREE-ARCHED UNDERGROUND STATION OF THE CLOSED METHOD FOR THE PYLON-TYPE WORKS PERFORMANCE 2022
  • Zakharov Georgij Rafaelevich
  • Maslak Vladimir Aleksandrovich
  • Ryabkov Stanislav Valerevich
  • Fadeeva Vera Borisovna
RU2795446C1
METHOD FOR ERECTION OF THREE-VAULT SUBWAY STATION OF CLOSED METHOD FOR PRODUCTION OF PYLON TYPE WORKS 2020
  • Zakharov Georgij Rafaelevich
  • Maslak Vladimir Aleksandrovich
  • Ryabkov Stanislav Valerevich
  • Tyushevskaya Lidiya Valentinovna
  • Fadeeva Vera Borisovna
RU2729474C1
THREE-VAULT METRO STATION OF CLOSED METHOD FOR PRODUCTION OF PYLON TYPE WORKS 2019
  • Zakharov Georgij Rafaelevich
  • Maslak Vladimir Aleksandrovich
  • Ryabkov Stanislav Valerevich
  • Tyushevskaya Lidiya Valentinovna
RU2715493C1
METHOD FOR ERECTION OF THREE-VANE SUBWAY STATION OF CLOSED METHOD OF PERFOMING WORKS WITH DOUBLE-TRACK MAIN LINE TUNNEL 2019
  • Zakharov Georgij Rafaelevich
  • Maslak Vladimir Aleksandrovich
  • Ryabkov Stanislav Valerevich
  • Tyushevskaya Lidiya Valentinovna
RU2704414C1
METHOD FOR CONSTRUCTION OF COLUMN-TYPE TWO-VANE SUBWAY STATION BY CLOSED METHOD OF PERFOMING WORKS 2019
  • Zakharov Georgij Rafaelevich
  • Maslak Vladimir Aleksandrovich
  • Tyushevskaya Lidiya Valentinovna
  • Donenko Ekaterina Evgenevna
RU2704415C1
THREE-ARCH UNDERGROUND STATION OF THE CLOSED COLUMN-TYPE 2022
  • Zakharov Georgij Rafaelevich
  • Maslak Vladimir Aleksandrovich
  • Ryabkov Stanislav Valerevich
  • Tyushevskaya Lidiya Valentinovna
RU2802893C1
METHOD FOR CONSTRUCTING UNDERGROUND STATION USING CLOSED METHOD OF CARRYING OUT WORK ON EXISTING UNDERGROUND LINE WITHOUT INTERRUPTING TRAIN TRAFFIC 2023
  • Zakharov Georgij Rafaelevich
  • Maslak Vladimir Aleksandrovich
  • Ryabkov Stanislav Valerevich
  • Fadeeva Vera Borisovna
RU2810984C1
METHOD FOR ERECTING A THREE-SPAN METRO STATION WITH A DOUBLE-TRACK MIDDLE STATION TUNNEL AND SIDE STATION HALLS WITH PASSENGER PLATFORMS 2022
  • Zakharov Georgij Rafaelevich
  • Maslak Vladimir Aleksandrovich
  • Ryabkov Stanislav Valerevich
  • Tyushevskaya Lidiya Valentinovna
  • Donenko Ekaterina Evgenevna
RU2779168C1
METHOD FOR CONSTRUCTING METRO STATION FROM PREFABRICATED ELEMENTS USING CLOSED METHOD OF PERFORMING WORK ON EXISTING METRO LINE WITHOUT INTERRUPTING TRAIN TRAFFIC 2023
  • Zakharov Georgij Rafaelevich
  • Maslak Vladimir Aleksandrovich
  • Ryabkov Stanislav Valerevich
RU2815900C1
METHOD FOR CONSTRUCTING A THREE-SPAN SUBWAY STATION OF AN OPEN METHOD OF PERFORMING WORKS WITH A LATERAL ARRANGEMENT OF PASSENGER PLATFORMS AND A DOUBLE-TRACK STILL TUNNEL 2018
  • Zakharov Georgij Rafaelevich
  • Maslak Vladimir Aleksandrovich
  • Ryabkov Stanislav Valerevich
  • Donenko Ekaterina Evgenevna
RU2692518C1

RU 2 735 506 C1

Authors

Zakharov Georgij Rafaelevich

Tyushevskaya Lidiya Valentinovna

Fadeeva Vera Borisovna

Dates

2020-11-03Published

2019-10-03Filed