FIELD: construction.
SUBSTANCE: invention relates to construction of tunnels, in particular to a method of constructing subway stations of open-pit method for production of works with lateral arrangement of platforms. Method of construction of three-span metro station of open method of works with lateral arrangement of passenger platforms and with double-track tunnels includes erection of central station tunnel from prefabricated tubing when driving double-track tunnels. Tubing rings made with rectangular cross-section and outer diameter equal to the diameter of the tunnels are assembled without seam ligation; lateral halls are erected by way of soil development. Concrete monolithic reinforced concrete walls are arranged in the middle station tunnel. Then monolithic reinforced concrete walls are concreted, located on the side of side halls, at that, tubing of vaulted and tray part of central station tunnel remain in concrete concretes of reinforced concrete walls. Main load-bearing structures of the station, the floor covering and covering elements of the station are concretered, and the tray plate of the middle station tunnel with a flat outer surface, the width of which provides arrangement of two paths, concrements simultaneously with the base under the path. In load-carrying monolithic reinforced concrete walls, temporary filling tubing is dismantled at the openings locations, monolith frames for framing openings are reinforced and concreted; then the apertures are equipped with sliding doors.
EFFECT: technical result consists in reducing the cost of erecting a plant, improving manufacturability, speed of construction and safety of operation.
1 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ERECTING A THREE-SPAN METRO STATION WITH A DOUBLE-TRACK MIDDLE STATION TUNNEL AND SIDE STATION HALLS WITH PASSENGER PLATFORMS | 2022 |
|
RU2779168C1 |
METHOD FOR ERECTION OF THREE-VANE SUBWAY STATION OF CLOSED METHOD OF PERFOMING WORKS WITH DOUBLE-TRACK MAIN LINE TUNNEL | 2019 |
|
RU2704414C1 |
THREE-ARCH UNDERGROUND STATION OF THE CLOSED COLUMN-TYPE | 2022 |
|
RU2802893C1 |
THREE-ARCHED UNDERGROUND STATION OF THE CLOSED METHOD FOR THE PYLON-TYPE WORKS PERFORMANCE | 2022 |
|
RU2795446C1 |
METHOD OF CONSTRUCTING SUBWAY PYLON STATION USING CLOSED METHOD OF PERFORMING WORKS ON OPERATING SUBWAY LINE WITHOUT INTERRUPTING TRAIN TRAFFIC | 2023 |
|
RU2824544C1 |
COLUMNED TRIPLE-ARCHED SUBWAY STATION WITHOUT SIDE PLATFORMS | 2009 |
|
RU2410495C1 |
METHOD FOR CONSTRUCTING UNDERGROUND STATION USING CLOSED METHOD OF CARRYING OUT WORK ON EXISTING UNDERGROUND LINE WITHOUT INTERRUPTING TRAIN TRAFFIC | 2023 |
|
RU2810984C1 |
THREE-VAULT METRO STATION OF CLOSED METHOD FOR PRODUCTION OF PYLON TYPE WORKS | 2019 |
|
RU2715493C1 |
THREE-SPAN METRO STATION CONSTRUCTED IN ACCORDANCE WITH THE OPEN BUILDING METHOD WITH AN ISLAND PASSENGER PLATFORM AND SINGLE-TRACK RUNNING TUNNELS | 2019 |
|
RU2746610C1 |
METHOD FOR CONSTRUCTING METRO STATION FROM PREFABRICATED ELEMENTS USING CLOSED METHOD OF PERFORMING WORK ON EXISTING METRO LINE WITHOUT INTERRUPTING TRAIN TRAFFIC | 2023 |
|
RU2815900C1 |
Authors
Dates
2019-06-25—Published
2018-10-30—Filed