FIELD: construction.
SUBSTANCE: invention relates to construction and can be used in construction of underground stations erected by closed method of works. Three-vault metro station of closed method for production of pylon-type works includes three non-overlapping tunnels of round section, medium tunnel of large diameter and two smaller lateral tunnels connected to mid tunnel by monolithic reinforced concrete walkways with openings for passengers passing to train cars, as well as passenger platforms and structures of two tracks. Rail tracks are located in middle tunnel made in the form of double-line ferry tunnel without finishing of tunnel inner surface. Passenger platforms are located in side tunnels, at that, step of openings axes for passage of passengers to cars of train is equal to distance between axes of doors of cars, and openings are equipped with framing frames and sliding doors on side of middle tunnel, which open synchronously with doors of cars.
EFFECT: technical result consists in improvement of technological effectiveness and speed of construction of three-vault metro stations, as well as improved safety of metro stations operation.
1 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ERECTION OF THREE-VAULT SUBWAY STATION OF CLOSED METHOD FOR PRODUCTION OF PYLON TYPE WORKS | 2020 |
|
RU2729474C1 |
THREE-ARCHED UNDERGROUND STATION OF THE CLOSED METHOD FOR THE PYLON-TYPE WORKS PERFORMANCE | 2022 |
|
RU2795446C1 |
METHOD FOR ERECTION OF THREE-VANE SUBWAY STATION OF CLOSED METHOD OF PERFOMING WORKS WITH DOUBLE-TRACK MAIN LINE TUNNEL | 2019 |
|
RU2704414C1 |
METHOD FOR CONSTRUCTING UNDERGROUND STATION USING CLOSED METHOD OF CARRYING OUT WORK ON EXISTING UNDERGROUND LINE WITHOUT INTERRUPTING TRAIN TRAFFIC | 2023 |
|
RU2810984C1 |
DOUBLE-VAULTED PYLON SUBWAY STATION, CONSTRUCTED BY TRENCHLESS METHOD | 2019 |
|
RU2735506C1 |
METHOD FOR CONSTRUCTING A THREE-SPAN SUBWAY STATION OF AN OPEN METHOD OF PERFORMING WORKS WITH A LATERAL ARRANGEMENT OF PASSENGER PLATFORMS AND A DOUBLE-TRACK STILL TUNNEL | 2018 |
|
RU2692518C1 |
METHOD FOR CONSTRUCTING METRO STATION FROM PREFABRICATED ELEMENTS USING CLOSED METHOD OF PERFORMING WORK ON EXISTING METRO LINE WITHOUT INTERRUPTING TRAIN TRAFFIC | 2023 |
|
RU2815900C1 |
COLUMNED TRIPLE-ARCHED SUBWAY STATION WITHOUT SIDE PLATFORMS | 2009 |
|
RU2410495C1 |
THREE-ARCHED UNDERGROUND STATION OF COLUMN TYPE AND ITS ERECTION METHODS (YURKEVICH DEVICE AND METHODS) | 2012 |
|
RU2510444C2 |
THREE-ARCH UNDERGROUND STATION OF THE CLOSED COLUMN-TYPE | 2022 |
|
RU2802893C1 |
Authors
Dates
2020-02-28—Published
2019-06-03—Filed