FIELD: civil engineering. SUBSTANCE: dividing sheet piling made of metal frames between the foundation of the existing building and that of the building under construction, driven into the base below the foundation footing is additionally provided with boring piles sunk into the bearing layer of the ground, and beams rig- idly secured in the upper part of the frame and resting on the pile heads, the length of the frame being limited by the active power of compressed ground layers in the base of the building under construction. EFFECT: lower consumption of steel and higher economy of erecting a dividing sheet piling. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
DIVIDING PILE WALL | 1993 |
|
RU2045621C1 |
METHOD OF UNDERGROUND STRUCTURE ERECTION IN URBAN BUILT-UP AREA | 2002 |
|
RU2245966C2 |
METHOD FOR STRAIGHTENING OF SLANT IN BUILDING ERECTED ON PILE FOUNDATION | 2008 |
|
RU2382146C1 |
METHOD AND DEVICE FOR INCREASING LOAD-BEARING CAPACITY OF FOUNDATION | 1997 |
|
RU2134325C1 |
METHOD FOR EXISTENT BUILDING, BUILDING STRUCTURE AND UNDERGROUND SERVICE LINE PROTECTION IN CONSTRUCTION AFFECTED ZONE | 2005 |
|
RU2291253C1 |
METHOD FOR BERTH STRUCTURE RECONSTRUCTION | 2003 |
|
RU2259441C1 |
METHOD FOR RECONSTRUCTION AND SUPERSTRUCTURE ERECTION ON BUILDINGS | 2011 |
|
RU2484219C2 |
METHOD FOR REINFORCEMENT OF PILE FOUNDATION | 2019 |
|
RU2728052C1 |
METHOD FOR REINFORCEMENT OF PILE FOUNDATION | 2019 |
|
RU2722901C1 |
CONSTRUCTIVE AND TECHNOLOGICAL SOLUTION FOR FOUNDATION OF INTERMEDIATE SUPPORT OF HIGH PILE WORK TYPE CONSTRUCTED IN TEMPORARY ENCLOSING STRUCTURE | 2023 |
|
RU2807350C1 |
Authors
Dates
1995-10-10—Published
1992-12-24—Filed