FIELD: civil engineering. SUBSTANCE: dividing pile wall comprises a solid enclosure from metal grooved piles secured in the bearing layer of the ground. Pile wall is disposed between the foundation of the existing building and that of the building under construction, wrapping around the foundation corners of the latter. The pile wall is provided with grooved piles sunk into the ground and spaced along the pile wall. The grooved piles of the wall are interconnected at the top by welded grooved piles and by horizontal tension bars arranged symmetrically with pile axes at a distance of 1/3 of their pitch. The wall height corresponds to the thickness of the compressed layer of the ground. EFFECT: improved design. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
DIVIDING SHEET PILING | 1992 |
|
RU2045620C1 |
METHOD FOR STRAIGHTENING OF SLANT IN BUILDING ERECTED ON PILE FOUNDATION | 2008 |
|
RU2382146C1 |
METHOD OF UNDERGROUND STRUCTURE ERECTION IN URBAN BUILT-UP AREA | 2002 |
|
RU2245966C2 |
METHOD AND DEVICE FOR INCREASING LOAD-BEARING CAPACITY OF FOUNDATION | 1997 |
|
RU2134325C1 |
METHOD FOR EXISTENT BUILDING, BUILDING STRUCTURE AND UNDERGROUND SERVICE LINE PROTECTION IN CONSTRUCTION AFFECTED ZONE | 2005 |
|
RU2291253C1 |
MULTI-PURPOSE BUILDING | 2007 |
|
RU2345200C2 |
METHOD FOR RECONSTRUCTION AND SUPERSTRUCTURE ERECTION ON BUILDINGS | 2011 |
|
RU2484219C2 |
END MOST ABUTMENT OF BRIDGE CROSSING FROM WELDED TUBULAR RABBET WITH FUNCTION OF RETAINING WALL | 2013 |
|
RU2543390C2 |
METHOD OF UNDERGROUND STRUCTURE ERECTION IN URBAN BUILT-UP AREA | 2002 |
|
RU2245428C2 |
METHOD FOR BERTH STRUCTURE RECONSTRUCTION | 2003 |
|
RU2259441C1 |
Authors
Dates
1995-10-10—Published
1993-02-08—Filed