UNDERGROUND STRUCTURE AND METHOD OF CONSTRUCTION OF UNDERGROUND STRUCTURE Russian patent published in 1997 - IPC

Abstract RU 2091542 C1

FIELD: construction of underground structures of civic, transport and agricultural applications. SUBSTANCE: the offered structure has walls, vault and trough. Vault is made in form of a part of ball shell and wells from pairs of internal and external piles combined by circular foundation mat with through apertures between separate pairs for radial adjoining of underground tunnels. External piles are inclined, and internal piles are vertical and combined by circular connector whose upper end face adjoins the foot of circular foundation mat, and lower end face adjoins the through. The method of construction of structure includes erection of walls. For which purpose, first, circular trench is excavated over the perimeter of vault heel down to foot elevation of circular foundation mat. Then, vertical and inclined piles are hammer-driven into bottom of trench, reinforcement is installed by pile heads and circular foundation mat is corrected in trench. Then, vault is erected using forms from ground with subsequent reinforcing and concreting of vault by forms shape. Ground between walls is removed through apertures between piles, and prior to making trough, circular connector is erected to combined vertical piles between one another. EFFECT: higher efficiency. 2 cl, 4 dwg

Similar patents RU2091542C1

Title Year Author Number
METHOD FOR CONSTRUCTION OF UNDERGROUND STRUCTURE 2009
  • Konash Viktor Maksimovich
RU2392388C1
METHOD FOR BUILDING OF MULTISTORY UNDERGROUND STRUCTURE WITH SIMULTANEOUS EXCAVATION OF BASIN 1999
  • Gusarov A.V.
  • Gusarov V.A.
  • Kadzhaja T.G.
  • Seljametov I.M.
  • Koldin V.N.
RU2136818C1
METHOD TO ERECT MULTISTORY SUBSURFACE STRUCTURE 2009
  • Karpov Andrej Viktorovich
RU2414563C1
PROCESS OF ERECTION OF MULTILEVEL UNDERGROUND STRUCTURE ( VARIANTS ) 2003
  • Zege S.O.
  • Zege I.A.
  • Zege N.S.
RU2220258C1
PROCESS OF ERECTION OF UNDERGROUND STRUCTURE 2001
RU2198263C1
THREE-ARCHED UNDERGROUND STATION OF COLUMN TYPE AND ITS ERECTION METHODS (YURKEVICH DEVICE AND METHODS) 2012
  • Jurkevich Pavel Borisovich
RU2510444C2
METHOD OF ERECTION OF UNDERGROUND STRUCTURES ALONG RIVER BED OR CANAL 2018
  • Chernov Ruslan Igorevich
RU2686206C1
METHOD FOR CONSTRUCTING UNDERGROUND PART OF BUILDING OR STRUCTURE UNDER AN EXISTING FOUNDATION 1993
  • Kogan A.L.
  • Kogan L.A.
  • Zokirov O.Z.
RU2035547C1
METHOD TO ERECT UNDERGROUND STRUCTURES BY "WALL IN SOIL" METHOD AND WALL IN SOIL ERECTED BY THIS METHOD 2011
  • Dzhantimirov Khristofor Avdeevich
  • Kitajkin Vjacheslav Anatol'Evich
  • Zachesov Vladimir Nikolaevich
  • Chernov Ruslan Igorevich
  • Zege Sergej Olegovich
  • Litvin Jaroslav Olegovich
  • Dzhantimirov Petr Khristoforovich
  • Artjukh Viktor Nilovich
RU2465401C1
METHOD OF ERECTING AN UNDERGROUND STRUCTURE 0
  • Natorkhin Boris Alekseevich
SU1019060A1

RU 2 091 542 C1

Authors

Fradkin A.A.

Dates

1997-09-27Published

1983-04-12Filed