FIELD: oil deposits development. SUBSTANCE: oil production method provides for drilling from ground surface of at least one slantingly directed borehole with horizontal furrow, deep pump running into borehole and oil withdrawal from borehole. Additional slant hole is drilled from slant part of borehole, in bottom hole of which deep pump is located to withdraw oil. The additional hole is located at zenith angle, that does not exceed value of α = arctg1/β with b factor of friction between pump-compressing and casing strings. Additional hole drilling site is located below static level of liquid in borehole. EFFECT: increased oil production of boreholes with horizontal holes. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR EXTRACTING OF HIGH-VISCOSITY OIL | 2002 |
|
RU2232263C2 |
METHOD OF RUNNING DROWNED OIL WELLS | 2001 |
|
RU2190086C1 |
METHOD OF WATER-PRODUCING OIL WELL OPERATION | 2013 |
|
RU2515643C1 |
METHOD OF OIL DEPOSIT DEVELOPMENT | 2001 |
|
RU2213857C2 |
PROCESS OF CONSTRUCTION AND RUNNING OF MULTIPLE FACE HOLE | 1999 |
|
RU2208119C2 |
METHOD OF DEVELOPMENT OF HIGH-VISCOSITY OIL POOL | 2000 |
|
RU2187630C2 |
OIL MINE METHOD OF OIL DEPOSIT DEVELOPMENT | 1992 |
|
RU2046935C1 |
METHOD FOR SIMULTANEOUS SEPARATE PRODUCTION OF OIL FROM TWO FORMATIONS OF ONE WELL BY PRODUCTION STRING | 2020 |
|
RU2738615C1 |
METHOD FOR DIRECTED WELL BORE POSITION DETERMINATION | 2002 |
|
RU2300631C2 |
METHOD FOR FRACTURED HIGHLY-VISCOUS OIL RESERVOIR DEVELOPMENT | 2006 |
|
RU2321734C1 |
Authors
Dates
1995-10-27—Published
1992-03-18—Filed