FIELD: railway transport. SUBSTANCE: method comes to mechanical treatment of rolling surface of switch worn point 2, placing it on underlayer 4 to eliminate incomplete resting and provide designed position. Underlayer 4 is rigidly secure on point foot. Layer of metal or metal strip is welded on lower portion of point head in cavity of point root part. Cavities, thus formed are milled and root part of point is connected with straight track rail by means of fishplates with rectilinear working surfaces. EFFECT: enhanced quality of maintenance. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR RECONDITIONING SWITCH | 1992 |
|
RU2049189C1 |
RAILWAY SWITCH RESTORATION METHOD | 2002 |
|
RU2221912C2 |
METHOD FOR RECOVERY OF RAILROAD SWITCH | 2015 |
|
RU2578629C1 |
RAILWAY TRACK SWITCH | 1997 |
|
RU2117086C1 |
METHOD FOR RECOVERY OF RAIL PROFILE (OPTIONS) | 2022 |
|
RU2779781C1 |
SPACING LUG FOR STUB-SWITCH POINTER | 2008 |
|
RU2376407C1 |
SWITCH | 2002 |
|
RU2230145C2 |
METHOD OF MANUFACTURING POINT SWITCH TONGUES WITH USE OF INTERMEDIATE PART | 2016 |
|
RU2646006C1 |
DEVICE TO PREVENT RAIL CREEPING | 2005 |
|
RU2278916C1 |
METHOD OF RESTORING WORN-OUT SURFACE OF FROG OF TRAMWAY SWITCH | 2023 |
|
RU2823194C1 |
Authors
Dates
1995-12-10—Published
1994-04-25—Filed