FIELD: construction. SUBSTANCE: device for installation of piles in ground includes body with longitudinal channels for supply of liquid and mortar and radial side nozzles. Radial side nozzles are installed by pairs in lower and upper parts of body at angle to horizon and provided with additional nozzles coaxial with channels for air supply. Two lower nozzles are mounted for vertical displacement and two other nozzles are rigidly installed at preset distance from the lower nozzles and displaced in horizontal plane. Located in body lower part at angle to its axis is conical stamp hinged to spring-loaded spindle installed in sleeve. Spindle is connected by means of kinematic ties lower movable nozzles. EFFECT: higher efficiency. 4 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR ERECTING PILES IN SOFT GROUND | 1993 |
|
RU2040642C1 |
METHOD FOR MAKING CEMENT/SOIL PILES IN CAVED-IN SOILS | 1993 |
|
RU2054502C1 |
METHOD OF MANUFACTURE OF UNDERGROUND STRUCTURES FROM GROUTED SOIL | 1992 |
|
RU2008396C1 |
METHOD FOR RECONSTRUCTION OF BUILDINGS, CONSTRUCTIONS | 1993 |
|
RU2065001C1 |
DEVICE FOR ERECTING CAST-IN-PLACE PILE | 1992 |
|
RU2054091C1 |
REINFORCED CONCRETE AUTOCLAVE | 1993 |
|
RU2056927C1 |
DEVICE FOR COMPACTION OF BUILDING MATERIALS | 1991 |
|
RU2016961C1 |
INSTRUMENT FOR CONTROL OF MOTION PARAMETERS | 1992 |
|
RU2020404C1 |
MOULDING ARRANGEMENT | 1991 |
|
RU2008203C1 |
METHOD FOR ERECTION OF BORED PILE WITH SOIL-CEMENT BROADENINGS IN WEAK SOILS ZONE AND DEVICE FOR ITS IMPLEMENTATION (VERSIONS) | 2019 |
|
RU2725363C1 |
Authors
Dates
1995-12-10—Published
1993-04-06—Filed