FIELD: prospecting for oil and gas storages. SUBSTANCE: injection wells to productive seam - collector outside of bounds of prospected part of field are drilled. Driving agents are pumped into it and products are taken from production wells located within prospected part of field. Seam pressure is measured and reserves of oil and gas are determined by equation of material balance. EFFECT: improved authenticity of method.
Title | Year | Author | Number |
---|---|---|---|
APPARATUS FOR OIL DEPOSIT DEVELOPMENT (VERSIONS) | 1992 |
|
RU2046931C1 |
METHOD FOR DEVELOPMENT OF GAS AND GAS-CONDENSATE FIELDS | 1992 |
|
RU2042794C1 |
METHOD FOR EXPLOITING MULTI-STRATA OIL (GAS) DEPOSIT | 1993 |
|
RU2038464C1 |
METHOD OF DEVELOPMENT OF OIL POOL | 1990 |
|
RU2088750C1 |
PROCESS OF PROSPECTING FOR GAS FIELDS OF ANTICLINAL STRUCTURES IN POOL AND MASS NATURAL RESERVOIRS | 1993 |
|
RU2069004C1 |
METHOD OF EXPLOITING GEOLOGIC HETEROGENEOUS OIL POOLS | 1983 |
|
SU1147084A1 |
METHOD OF DEVELOPMENT OF SHALLOW LOW-YIELD OIL DEPOSITS | 2007 |
|
RU2342521C1 |
METHOD OF DEVELOPMENT OF MULTIBED OIL DEPOSITS | 2005 |
|
RU2338059C2 |
METHOD OF DEVELOPING OIL DEPOSIT WITH SEVERAL OIL ACCUMULATIONS LOCATED ONE ABOVE ANOTHER | 2010 |
|
RU2441145C1 |
METHOD TO DEVELOP LOW-EXPLORED OIL DEPOSIT | 2011 |
|
RU2447270C1 |
Authors
Dates
1996-02-10—Published
1991-11-11—Filed