FIELD: hydraulic engineering. SUBSTANCE: fish pass is made in the form a train of chambers 2 placed at the same horizontal base 1 and of depth gradually decreased towards tail water by a constant value. Entry openings 3 are originated in the lower part of walls of chambers 2. Guard grids 5 are placed at the level of top of the entry openings 3 in chambers 2. EFFECT: favorable conditions for fish motion along the fish pass with uniform water level drop between adjacent chambers. 2 dwg
Authors
Dates
1996-04-10—Published
1991-06-25—Filed