FIELD: civil engineering. SUBSTANCE: under surface part of the building is formed in horizontal position with face side down and subsequent turning out the walls into vertical position. Technological fixture is used for the purpose of this made in the form of retracted stands coupled in pairs with flexible links. Raising is carried out by subsequent loading flexible links with forces perpendicular to axis of the flexible links. EFFECT: monolithic buildings. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCESS OF CONSTRUCTION OF BUILDINGS ( VARIANTS ) | 1999 |
|
RU2194833C2 |
PROCESS OF ERECTION OF BUILDINGS AND GEAR FOR ITS REALIZATION | 2000 |
|
RU2194832C2 |
SEMISUBMERSIBLE FLOATING DRILLING RIG | 1997 |
|
RU2118268C1 |
PROCESS OF TRANSPORTATION OF CARGOES IN WATER AREAS IN WINTER TIME | 1996 |
|
RU2122060C1 |
ELECTRICAL ENERGY GENERATION PROCESS AND DEVICE | 1997 |
|
RU2154713C2 |
METHOD TO ERECT SITE-CAST SKELETON BUILDING WITH DECORATIVE OUTER FINISH | 2009 |
|
RU2421580C1 |
MODULAR FOLDING FRAMEWORK OF BUILDING | 2016 |
|
RU2632831C1 |
METHOD FOR ERECTING MULTISTORY BUILDING | 0 |
|
SU1795048A1 |
METHOD OF INCREASING THE SEISMIC RESISTANCE OF LARGE-PANEL HOUSES WITHOUT WALL COLUMNS | 2017 |
|
RU2664562C1 |
LOW RISE BUILDING | 2008 |
|
RU2369707C1 |
Authors
Dates
1996-04-10—Published
1992-05-13—Filed