FIELD: construction industry. SUBSTANCE: invention is related predominantly to erection of low-rise buildings from reinforced concrete near large water basins and on flooded territory, for instance, in shallow-water bays. Process of erection of building includes preparation of site to locate building, for example, formation of foundation pit, formation of halves of building including base in horizontal position and their transfer to vertical position. Halves of buildings are formed on floating platforms which are situated in artificial or natural pond. For transfer of halves of building to vertical position these halves are submerged in water starting from base parts. EFFECT: simplified process of erection of building. 2 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCESS OF CONSTRUCTION OF BUILDINGS ( VARIANTS ) | 1999 |
|
RU2194833C2 |
METHOD FOR ERECTING BUILDINGS | 1992 |
|
RU2057866C1 |
PROCESS OF TRANSPORTATION OF CARGOES IN WATER AREAS IN WINTER TIME | 1996 |
|
RU2122060C1 |
SEMISUBMERSIBLE FLOATING DRILLING RIG | 1997 |
|
RU2118268C1 |
ELECTRICAL ENERGY GENERATION PROCESS AND DEVICE | 1997 |
|
RU2154713C2 |
UNDERWATER GARAGE FOR VEHICLES AND METHOD TO CONSTRUCT UNDERWATER GARAGE | 2010 |
|
RU2468151C2 |
FOUNDATION OF FLOATING MASSIF INSTALLED ONTO BASE BY FLOAT-ON METHOD | 2011 |
|
RU2473743C2 |
METHOD FOR ARRANGEMENT OF SHALLOW SUBWAY AT WATER AREA BOTTOM | 2008 |
|
RU2386755C1 |
METHOD FOR BLOCK-MODULAR CONSTRUCTION OF STRUCTURES IN FOUNDATION PITS AND BURIED STRUCTURE FOR MILITARY INFRASTRUCTURE FACILITIES | 2018 |
|
RU2702779C1 |
METHOD FOR FORMATION OF CLOSED SECTION OF WATER AREA BOTTOM WITH POSSIBILITY OF ITS DRYING AND SYSTEM, WHICH REALISES IT | 2008 |
|
RU2382142C2 |
Authors
Dates
2002-12-20—Published
2000-03-24—Filed