FIELD: civil engineering. SUBSTANCE: hopper with concrete cast pipe and closed water proof gate is loaded with concrete of concrete stirrer. The hopper is carried out inside channel guard to the place where concerting is needed and gate of concrete cast pipe is installed to soil. Then the gate is released. The hopper and concrete cast pipe are elevated a little at a height equal to 0.5 - 0.6 pipe diameter, and a portion of concrete mixture equal to hopper volume is laid down to the appropriate place. After laying down a portion of concrete mixture the hopper and concrete cast pipe are withdrawn, water proof gate is closed, and hopper is loaded again with concrete mixture, then the process is repeated again. EFFECT: high productivity. 5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CONSTRUCTING BRIDGE SUPPORT IN WATER AREA | 2023 |
|
RU2809049C1 |
UNIT FOR WATER TABLE DEPRESSION | 1993 |
|
RU2035546C1 |
METHOD OF BRIDGE BUILDING OVER WATER BODY | 2004 |
|
RU2237123C1 |
METHOD OF CONSTRUCTING BRIDGE SUPPORT GRILLAGE IN RIVER WATER AREA | 2023 |
|
RU2809068C1 |
METHOD FOR MONITORING PROCESS PARAMETRES OF WORKS PERFORMANCE BY METHOD "WALL IN SOIL" | 2007 |
|
RU2392383C2 |
CONSTRUCTIVE AND TECHNOLOGICAL SOLUTION FOR FOUNDATION OF INTERMEDIATE SUPPORT OF HIGH PILE WORK TYPE CONSTRUCTED IN TEMPORARY ENCLOSING STRUCTURE | 2023 |
|
RU2807350C1 |
METHOD OF CONSTRUCTING THE UNDERWATER PART OF STRUCTURE IN WATER-SATURATED SOILS | 0 |
|
SU1133345A1 |
PROCESS OF PLACING CONCRETE INTO CAST-IN-PLACE PILES AND INSTALLATION FOR ITS IMPLEMENTATION | 1996 |
|
RU2097489C1 |
ACCELERATED BERTH RECONSTRUCTION | 2020 |
|
RU2745318C1 |
METHOD OF ERECTION OF UNDERGROUND STRUCTURES ALONG RIVER BED OR CANAL | 2018 |
|
RU2686206C1 |
Authors
Dates
1996-08-10—Published
1993-04-15—Filed