METHOD FOR LAYING DOWN OF TAMPONAGE LAYER IN FOUNDATION PIT GUARDED WITH CHANNEL Russian patent published in 1996 - IPC

Abstract RU 2064997 C1

FIELD: civil engineering. SUBSTANCE: hopper with concrete cast pipe and closed water proof gate is loaded with concrete of concrete stirrer. The hopper is carried out inside channel guard to the place where concerting is needed and gate of concrete cast pipe is installed to soil. Then the gate is released. The hopper and concrete cast pipe are elevated a little at a height equal to 0.5 - 0.6 pipe diameter, and a portion of concrete mixture equal to hopper volume is laid down to the appropriate place. After laying down a portion of concrete mixture the hopper and concrete cast pipe are withdrawn, water proof gate is closed, and hopper is loaded again with concrete mixture, then the process is repeated again. EFFECT: high productivity. 5 dwg

Similar patents RU2064997C1

Title Year Author Number
METHOD FOR CONSTRUCTING BRIDGE SUPPORT IN WATER AREA 2023
  • Konnykh Andrej Albertovich
  • Sukhorukov Aleksej Aleksandrovich
  • Romanov Dmitrij Vyacheslavovich
  • Kolyushev Igor Evgenevich
  • Lyutyj Sergej Mikhajlovich
  • Malygin Evgenij Gennadevich
RU2809049C1
UNIT FOR WATER TABLE DEPRESSION 1993
  • Levin S.A.
  • Onishchuk V.M.
RU2035546C1
METHOD OF BRIDGE BUILDING OVER WATER BODY 2004
  • Kostylev V.V.
  • Sur E.G.
RU2237123C1
METHOD OF CONSTRUCTING BRIDGE SUPPORT GRILLAGE IN RIVER WATER AREA 2023
  • Konnykh Andrej Albertovich
  • Sukhorukov Aleksej Aleksandrovich
  • Chentsov Igor Valentinovich
  • Popov Aleksandr Nikolaevich
  • Gorbachev Sergej Evgenevich
  • Ponomarev Andrej Vladimirovich
RU2809068C1
METHOD FOR MONITORING PROCESS PARAMETRES OF WORKS PERFORMANCE BY METHOD "WALL IN SOIL" 2007
  • Afanas'Ev Aleksandr Alekseevich
  • Injutin Maksim Aleksandrovich
RU2392383C2
CONSTRUCTIVE AND TECHNOLOGICAL SOLUTION FOR FOUNDATION OF INTERMEDIATE SUPPORT OF HIGH PILE WORK TYPE CONSTRUCTED IN TEMPORARY ENCLOSING STRUCTURE 2023
  • Kolyushev Igor' Evgen'Evich
  • Nikolaev Vasilij Evgen'Evich
  • Nikolaev Artem Aleksandrovich
  • Malan'In Aleksandr Viktorovich
  • Zimirev Oleg Nikolaevich
  • Malygin Evgenij Gennad'Evich
RU2807350C1
METHOD OF CONSTRUCTING THE UNDERWATER PART OF STRUCTURE IN WATER-SATURATED SOILS 0
  • Snisarenko Vladimir Ivanovich
  • Filakhtov Aleksej Lazarevich
  • Dudnik Vyacheslav Sergeevich
  • Babeshko Andrej Fedorovich
SU1133345A1
PROCESS OF PLACING CONCRETE INTO CAST-IN-PLACE PILES AND INSTALLATION FOR ITS IMPLEMENTATION 1996
  • Smirnov Aleksandr Jur'Evich
  • Panin Igor' Aleksandrovich
  • Kritsberg Leonid Vol'Fovich
  • Kats Konstantin Mikhajlovich
  • Chemerinskij Oleg Isidorovich
  • Likverman Anatolij Izrailovich
  • Chepurnov Konstantin Gavrilovich
  • Khashov Aleksandr Viktorovich
  • Raevskij Nikolaj Aleksandrovich
  • Akatov Vjacheslav Pavlovich
  • Gur'Janov Jurij Aleksandrovich
  • Shvyrev Aleksandr Petrovich
RU2097489C1
ACCELERATED BERTH RECONSTRUCTION 2020
  • Zhelezkin Sergej Georgievich
RU2745318C1
METHOD OF ERECTION OF UNDERGROUND STRUCTURES ALONG RIVER BED OR CANAL 2018
  • Chernov Ruslan Igorevich
RU2686206C1

RU 2 064 997 C1

Authors

Levin S.A.

Dates

1996-08-10Published

1993-04-15Filed