FIELD: gas-petroleum geology. SUBSTANCE: used for checking intervals of geological record of holes in zones of interfluidic contacts and ensures reduction of volumetric deformation of casing tubes, also minimizes untightness of threaded joints of sleeves and tubes and degree of cracking cement stone beyond casing string during perforation of casing string intervals such as in zone of interfluidic contacts. First, perforator is selected, density of casing string column and perforation interval are determined according to geological record. Then perforator is equipped and lowered down into hole. Perforating operation is performed and actual position of perforation interval in casing string is determined. Prior to that, position of sleeves on casing tubes in hole within perforation interval is found with the help of sleeve locator. Exposed band-type shaped-charge perforator in the form of sections is used. Its length is equal to extension of casing string perforation interval. Charges are adapted to selective electric firing and location with clearance in casing string relative to frontal part of container. Idle sections between charges are of length equal to sum of sleeve length and two double spacings between charges. During lowering-down of perforator each section of it with charges is positioned symmetrically relative to sleeves. Perforations is performed in two salvos. First salvo induces two charges symmetrically neared toward center of section and located in each section with charges. Second salvo fires all remaining charges. EFFECT: high efficiency. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PREDICTION OF OIL-BEARING CAPABILITY OF TERRIGENOUS SECTIONS OF WELLS | 1993 |
|
RU2068188C1 |
METHOD OF PREDICTION OF OIL DEPOSIT IN SECTIONS OF WELL | 1994 |
|
RU2068190C1 |
METHOD FOR DETERMINING PERMEABILITY OF POROUS COLLECTORS OF OIL AND GAS | 1992 |
|
RU2054653C1 |
DEVICE AND METHOD FOR THERMAL GAS-HYDRODYNAMIC OIL AND GAS FORMATION FRACTURE (VERSIONS) | 2012 |
|
RU2493352C1 |
SECONDARY BED DRILLING-IN AT DEPRESSION WITH LOWERING OF PERFORATOR FOR SUBSURFACE PUMP AND DEVICE TO THIS END (VERSIONS) | 2014 |
|
RU2571790C1 |
BULLET PERFORATOR AND METHOD OF ITS USE | 1991 |
|
RU2016192C1 |
METHOD AND DEVICE FOR GAS-HYDRODYNAMIC FRACTURING OF PRODUCTIVE FORMATIONS FOR DEVELOPMENT OF PROBLEMATIC RESERVES (VARIANTS) | 2010 |
|
RU2442887C1 |
METHOD FOR GAS-DYNAMIC ACTION ON FORMATION | 2015 |
|
RU2582353C1 |
DEVICE AND METHOD OF THERMO-GAS-HYDRO-DEPRESSION WAVE FRACTURING OF PRODUCTIVE FORMATIONS FOR DEVELOPMENT OF HARD-TO-RECOVER RESERVES (VERSIONS) | 2015 |
|
RU2592910C1 |
METHOD AND DEVICE FOR CUMULATIVE OIL WELL PERFORATION (VARIANTS) | 2004 |
|
RU2275496C2 |
Authors
Dates
1996-08-27—Published
1993-04-13—Filed