FIELD: construction of pipelines in frozen grounds. SUBSTANCE: method for laying of pipeline in medium having buoyant force consists in multi-slot cutting of ground, laying pipeline 7 on crest of ground columns and furnishing the pipeline with weighing members with ground 6. When layer 1 and columns 3 thaw, pipeline 7 immerses into thaw ground. During seasonal freezing of ground, pipeline is frozen in the ground, and bank is to be formed above the pipeline. EFFECT: higher efficiency. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF LAYING PIPE LINE | 1989 |
|
RU2036365C1 |
METHOD OF SUBTERRANEAN LAYING OF PIPE LINE IN SOFT GROUND | 1991 |
|
RU2027938C1 |
PIPELINE WEIGHTING UNIT | 1992 |
|
RU2066807C1 |
PROCESS OF LAYING GAS PIPE-LINE IN PERMAFROST | 1987 |
|
SU1438344A1 |
ANTIEROSION SYSTEM FOR PIPE LINE ON SLOPE | 1993 |
|
RU2062936C1 |
METHOD OF SOIL EXCAVATION AND RECULTIVATION AT LINING PIPE LINE | 1992 |
|
RU2039313C1 |
PIPELINE WEIGHTER | 1992 |
|
RU2062938C1 |
METHOD OF LAYING PIPE-LINE WITH NEGATIVE BUOYNCY | 0 |
|
SU1427141A1 |
HEAT-SHIELDING SET FOR UNDERGROUND PIPELINE | 2008 |
|
RU2346199C1 |
METHOD FOR DRIVING A GAS MAIN IN MAN-MADE TRENCH AT PERMAFROST SOIL TERRITORY (VARIANTS) AND DEVICE FOR REALIZATION OF METHOD (VARIANTS) | 2006 |
|
RU2303736C1 |
Authors
Dates
1996-09-20—Published
1992-09-11—Filed