FIELD: lining and repairing pipe lines. SUBSTANCE: two members of a protecting covering, made of, e.g. snow or ice, are built-up on both sides of the projecting axis of a pipe line. A trench is made between the members of the covering. For this purpose, the mineral soil is ground up to 5 cm fraction and placed on the surface of the covering. A pipe line is laid into the trench and the trench is filled with the fine fraction soil. The humus coating is then restored. EFFECT: simplified method. 4 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF LAYING PIPE LINE | 1989 |
|
RU2036365C1 |
ANTIEROSION SYSTEM FOR PIPE LINE ON SLOPE | 1993 |
|
RU2062936C1 |
METHOD FOR CONDUCTING EARTH MOVING OPERATIONS IN LAYING PIPELINES | 0 |
|
SU901408A1 |
SCREEN FOR PROTECTION OF WATER FROM POLLUTION WITH GROUND DURING UNDERWATER EARTH-MOVING WORK | 1992 |
|
RU2014380C1 |
METHOD FOR LAYING OF PIPELINE IN MEDIUM HAVING BUOYANT FORCE | 1992 |
|
RU2066806C1 |
SCREEN FOR PROTECTION OF WATER MEDIUM FROM CONTAMINATION WITH GROUND IN UNDERWATER GROUND EXCAVATION JOBS | 1992 |
|
RU2029015C1 |
PIPELINE WEIGHTING UNIT | 1992 |
|
RU2066807C1 |
HEAT-SHIELDING SET FOR UNDERGROUND PIPELINE | 2008 |
|
RU2346199C1 |
METHOD OF PIPELINE BACKFILL AND DEVICE FOR ITS IMPLEMENTATION | 2007 |
|
RU2335684C1 |
TRENCH WORKING AND FILLING METHOD | 0 |
|
SU1745836A1 |
Authors
Dates
1995-07-09—Published
1992-12-25—Filed