FIELD: nuclear power engineering. SUBSTANCE: spiral tunnel is driven around vertical pipes and filter pit and is continued in the form of connection tunnel below connection. Means to catch and neutralize ejection are manufactured in the form of vertical cylindrical antiejection chamber with concrete lining and built in vertical ventilation holes. Chambers are mapped by closed isolated internal and external barrage contours. Spiral tunnel, connection and connection tunnel are built in doubled internal and external barrage contours. Internal contours are antifiltration ones against leakage of radioactive substances from inside outwards, external contours are hydraulic insulation ones against migration of underground water from outside into workings of channels. EFFECT: increased safety of underground antiejection channel. 4 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
PROTECTION SHALL FOR NUCLEAR POWER PLANT | 1990 |
|
RU2009553C1 |
METHOD OF UNDERGROUND MINING OF ORE BODY WITH SELF-CEMENTING FILL OF GOAF | 0 |
|
SU1709093A1 |
METHOD OF UNDERGROUND MONITORED CONFINEMENT OF RADIOACTIVE WASTE IN SOLIDIFYING FILLING OF WORKED-OUT SPACE OF ORE BODY | 1990 |
|
SU1782135A1 |
METHOD FOR ERECTING INTRA-CITY CIRCULAR MOTORWAY | 1999 |
|
RU2175367C2 |
METHOD FOR ERECTION OF VEHICULAR TRAFFIC TUNNEL OF URBAN RING HIGHWAY OF MEGAPOLIS | 1999 |
|
RU2152473C1 |
METHOD FOR ERECTION OF URBAN RING HIGHWAY SECTION MEGAPOLIS | 1999 |
|
RU2152470C1 |
INTRA-CITY CIRCULAR MOTORWAY | 1999 |
|
RU2175364C2 |
UNDERGROUND LONG-TERM STORAGE AND/OR DEPOSITION FACILITY FOR PACKINGS OF RADIOACTIVE WASTES | 2010 |
|
RU2431210C1 |
METHOD FOR VENTILATION OF UNDERGROUND MINING OPERATIONS IN COMBINED DEVELOPMENT OF SYNCLINAL COAL DEPOSITS | 2017 |
|
RU2679003C1 |
UNDERGROUND MINING WORKINGS VENTILATION METHOD DURING THE ANTICLINAL COAL DEPOSITS COMBINED DEVELOPMENT | 2017 |
|
RU2679015C1 |
Authors
Dates
1996-10-10—Published
1992-08-25—Filed