FIELD: mining; development of gently sloping seams with formation of inclined workings driven to the semi dip in protecting (artificial) pillars from filling materials. SUBSTANCE: method for development of coal seams includes successive driving in extraction district, at least, upcast and belt inclines with formation of protecting pillars on both sides of inclines and making connections between them. Protecting pillars are made in form of rock packs for which purpose driven in prepared extraction district, parallel to side wall of upcast or belt incline made in overlying extraction district, is inclined opening in form of stope, and in the course of driving the stope, previously driven stope parallel to the side wall of upcast or belt incline is filled with rock. Then, driven between rock packs and nonmined coal mass and in the interval between driven upcast and belt inclines, parallel to the side walls are additional stopes with their subsequent filling. Belt and upcast inclines are driven in the developed underlying extraction district. In this case, coal pillars are formed additionally between extraction district in which belt and air gates are driven to mine the indicated districts. EFFECT: higher efficiency. 2 cl, 10 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF SLANT COAL SEAMS DEVELOPMENT | 1994 |
|
RU2068498C1 |
METHOD OF HYDRAULIC MINING OF STEEP THICK SEAMS WITH SOLID HARDENING GOBBING | 1993 |
|
RU2084631C1 |
METHOD FOR MINING THICK STEEPLY DIPPING SEAMS BY HYDRAULIC BREAKING WITH CAST SELF-CEMENTING FILL | 1993 |
|
RU2069752C1 |
METHOD FOR ROOF CONTROL IN MINING COAL SEAMS | 1992 |
|
RU2067174C1 |
METHOD FOR LONGWALL ADVANCING TO THE RISE WITH SUBLEVEL COAL CUTTING AND HYDRAULIC STOWING OF GOBS | 0 |
|
SU1797656A3 |
METHOD FOR THICK STEEP MINERAL SEAM MINING ALONG WITH GOAF FILLING | 2005 |
|
RU2283431C1 |
DEVELOPMENT METHOD OF THICK STEEP COAL BEDS | 2011 |
|
RU2477795C1 |
METHOD OF WORKING COAL BEDS | 0 |
|
SU907252A1 |
METHOD FOR RILL CUT MINING OF THICK STEEPLY DIPPING BEDS WITH FILLING | 1993 |
|
RU2069748C1 |
THICK PITCHING COAL SEAM EXPLOITATION METHOD | 0 |
|
SU1745938A1 |
Authors
Dates
1996-11-20—Published
1994-01-10—Filed