FIELD: electric prospecting. SUBSTANCE: vertical sources and receivers of signals of electric field are positioned in upper layer under drifting ice-floe. Excitation and registration are carried out in process of drift of ice-floe. Excitation and receiving device is constantly in vertical position because of same speed of movement of ice-floe and thickness of water lying beneath it. Alternating periodic pulses with pauses excited. Process of establishment of vertical component of electric field is measured within pause. Difference of vertical differences of potentials related to their sum serves as interpretation parameters. EFFECT: improved authenticity of method. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF SEA SEISMIC PROSPECTING | 1992 |
|
RU2076342C1 |
PROCESS OF GEOLOGICAL PROSPECTING | 1991 |
|
RU1835939C |
METHOD OF GEOLOGICAL SURVEY | 1990 |
|
SU1701046A3 |
DEVICE FOR OFFSHORE ELECTRIC PROBING OF DEPOSITS OF DEEP-SEA POLYMETALLIC SULPHIDES AND METHOD FOR ITS IMPLEMENTATION | 2022 |
|
RU2791565C1 |
METHOD OF ELECTRIC PROSPECTING WHILE SEARCHING FOR OIL AND GAS FIELDS | 2001 |
|
RU2208818C2 |
METHOD FOR MARINE ELECTRICAL EXPLORATION | 2017 |
|
RU2642492C1 |
METHOD AND DEVICE FOR MARINE ELECTRICAL EXPLORATION OF OIL AND GAS FIELDS | 2006 |
|
RU2375728C2 |
MARINE ELECTRICAL EXPLORATION METHOD AND DEVICE FOR ELECTRICAL EXPLORATION DURING MOVEMENT OF VESSEL | 2007 |
|
RU2425399C2 |
METHOD OF NAVAL SEISMIC EXPLORATION | 1992 |
|
RU2072535C1 |
METHOD OF MARINE ELECTRICAL EXPLORATION OF OIL AND GAS FIELDS AND SYSTEM OF EQUIPMENT FOR ITS IMPLEMENTATION | 2006 |
|
RU2324956C2 |
Authors
Dates
1996-11-20—Published
1993-02-09—Filed