FIELD: road building in regions with below-zero average annual temperature, mainly in northern regions. SUBSTANCE: method comes to clearing road lane from wood, bushes and moss-and-plant cover, making side water ditches, natural thawing and drying base ground, filling soil on base and strengthening the layer subsequently compacting it. For strengthening roadbed cut off bushes are used which are uniformly distributed over soil surface lengthwise the roadbed. Then layer is impregnated with used engine oil and sand and gravel mixture is applied to form levelling layer, 5-7 cm thick, subsequently compacting the layer. EFFECT: reduced cost of road building. 3 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF ROADBED CONSTRUCTION | 1994 |
|
RU2069717C1 |
CONSTRUCTION OF ROAD PAVEMENT FOR TEMPORARY AGRICULTURAL ROADS | 2017 |
|
RU2652205C1 |
CONSTRUCTION OF ROAD PAVEMENT FOR TEMPORARY ROADS FOR AGRICULTURAL PURPOSES | 2015 |
|
RU2596164C1 |
METHOD OF CONSTRUCTING AN EARTH TRACK | 0 |
|
SU1189942A1 |
METHOD FOR ERECTING EMBANKMENT FROM SUBSTANDARD SOILS ON PERMAFROST | 2016 |
|
RU2647517C1 |
ROAD STRUCTURE | 2012 |
|
RU2516408C1 |
ROAD EMBANKMENT OVER PERMANENTLY FROSEN SOILS | 2006 |
|
RU2324032C1 |
ROAD STRUCTURE | 2014 |
|
RU2573892C1 |
METHOD FOR PHASED COMPLEX ENGINEERING PROTECTION OF GENERAL PLANNING EMBANKMENT | 2008 |
|
RU2390605C1 |
PROCESS OF ERECTION OF EARTHEN STRUCTURES WITH ADHERENCE TO INCREASED ECOLOGICAL REQUIREMENTS IN NORTHERN REGIONS | 2002 |
|
RU2221101C2 |
Authors
Dates
1996-11-27—Published
1994-09-29—Filed