FIELD: metallurgy. SUBSTANCE: prior to treatment metal is overheated by 80-120 o C above liquidus temperature. Time of action of electric and water hammer is found from relation τ = 10-3(8,4+0,02 Δt) M0,5•BS(m)•Δt, where τ is duration of action, min; Dt is temperature of overheating of melt above liquidus temperature, o; BS(m) is action intensity, J/kgf; M is mass of melt. EFFECT: enhanced efficiency. 2 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR TREATING MOLTEN METAL | 0 |
|
SU1776218A3 |
PULSE CURRENT GENERATOR | 1990 |
|
RU2014730C1 |
ELECTRODE FOR ELECTROHYDRAULIC IMMERSION DEVICES | 1990 |
|
RU2088756C1 |
PART REBUILDING METHOD | 0 |
|
SU1822372A3 |
METHOD OF BUILDING HIGH AND ULTRAHIGH PRESSURES | 1991 |
|
RU2025173C1 |
SEMICONDUCTOR DEVICE HEAT SINK | 1990 |
|
RU2012098C1 |
METHOD OF ELECTRICAL DISCHARGE INITIATION IN WATER | 1990 |
|
RU1741352C |
DEVICE FOR CAPACITOR BANK DISCHARGE | 0 |
|
SU1835110A3 |
METHOD FOR MANUFACTURING PARTS | 0 |
|
SU1804358A3 |
METHOD OF MANUFACTURING TARGETS FROM CHROMIUM AND CHROMIUM-BASED ALLOYS | 1992 |
|
RU2103393C1 |
Authors
Dates
1996-12-10—Published
1990-02-16—Filed