FIELD: mining. SUBSTANCE: cleaning mechanized complex in the upper seam portion is moved above rock interburden. Cropper coal in the upper seam portion or coal bench in long face fall-through of the lower seam portion are possible. Complex is moved in the upper seam portion with additional coal excavation and aftermoving end portions of the complex. EFFECT: higher efficiency. 3 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR INTERACTION OF SUPPORT UNIT WITH SIDE ROCKS | 1990 |
|
RU2028452C1 |
METHOD OF SUPPORT MOVEMENT | 1990 |
|
RU2007582C1 |
METHOD FOR MINERAL MINING AND DEVICE FOR ITS REALIZATION | 1992 |
|
RU2033522C1 |
DEVICE FOR CONJUGATING FACE WITH DRIFT | 1992 |
|
RU2024760C1 |
END UNIT OF POWERED SUPPORT | 1991 |
|
RU2021525C1 |
METHOD FOR SUPPORT OF LONGWALL FACE-TO-GATE JUNCTION | 1992 |
|
RU2067176C1 |
PROCESS OF UNINTERRUPTED WINNING OF COAL BY CLEARING COMBINE | 1996 |
|
RU2134791C1 |
METHOD OF MINING TWIN LONGWALLS BY LONGWALL SET OF EQUIPMENT | 0 |
|
SU1408069A1 |
POWERED CONNECTION SUPPORT | 1991 |
|
RU2011835C1 |
GATE-END TRANSFER POINT | 1992 |
|
RU2044890C1 |
Authors
Dates
1997-01-20—Published
1992-12-07—Filed