FIELD: metallurgy, namely, production of rolls for continuous billet casting. SUBSTANCE: before fitting rings are stacked, then they are heated and arbor is vertically descended to annular cavity of ring stack until mark of band fitting. Said arbor is fixed in predetermined position and inlet guiding cone is formed on it. Fixation in predetermined position is realized by means of technological annular bead of arbor. Band is heated at temperature gradient along its height; lower ring of band is heated up to maximum temperature value. Arbor is lubricated by graphite before mounting it. Ring stack of band before heating is mounted in jig. EFFECT: enhanced efficiency. 6 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCESS OF SHROUDING OF PARTS | 1997 |
|
RU2111831C1 |
METHOD FOR REPAIRING ROLLING ROLLS | 2023 |
|
RU2808509C1 |
CHROMIUM-MANGANESE-ALUMINUM CAST IRON | 1998 |
|
RU2138577C1 |
METHOD FOR HARDENING OF BULKY ARTICLES OF COMPLICATED CONFIGURATION | 1996 |
|
RU2105823C1 |
DIE FOR MANUFACTURING HOLLOW FORGES WITH SIDE PIPES | 1991 |
|
RU2021067C1 |
PRESTRESSED BUILTUP ROLLING ROLL | 2002 |
|
RU2226134C2 |
BUILTUP ROLLING ROLL | 1999 |
|
RU2211101C2 |
COMPOSITE MILL ROLL | 2014 |
|
RU2579322C1 |
ROLLING MILL ROLL | 0 |
|
SU1304948A1 |
COMPOSITE FORMING ROLL | 2014 |
|
RU2561618C1 |
Authors
Dates
1997-02-27—Published
1993-12-09—Filed