FIELD: laying under-ground pipe lines under obstacle. SUBSTANCE: well is sunken and its walls are lined after which pipe line is delivered to it. Well is filled with suspension beforehand; suspension is mixed before end of pipe line when it is brought into well. Pipe line is centered in well suspension is forced out of circular clearance by suspension of greater density. EFFECT: enhanced reliability. 7 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR TRENCHLESS PIPE LAYING IN GROUND | 1992 |
|
RU2005858C1 |
METHOD FOR FORMATION OF HOLES IN GROUND | 1992 |
|
RU2034118C1 |
METHOD AND DEVICE FOR CREATION OF PIPELINE IN GROUND | 1996 |
|
RU2127346C1 |
METHOD FOR MAKING HOLES IN GROUND | 1993 |
|
RU2034120C1 |
DRILLING-IN DEVICE | 0 |
|
SU1709031A1 |
METHOD AND DEVICE FOR TRENCHLESS LAYING OF UNDERGROUND SERVICE LINES | 1996 |
|
RU2103447C1 |
METHOD TO PRODUCE WELLS IN SOIL FOR TRENCHLESS INSTALLATION OF UTILITIES (VERSIONS) | 2012 |
|
RU2495198C1 |
METHOD OF DRAW-IN PIPING IN GROUND (VERSIONS) | 2007 |
|
RU2344241C1 |
METHOD OF TRENCHLESS INSTALLATION OF BUNDLE OF PIPES IN SOIL | 2012 |
|
RU2502848C1 |
STEAM-AND-WATER ROCKET ENGINE (VERSIONS) | 1996 |
|
RU2117176C1 |
Authors
Dates
1997-03-20—Published
1995-08-18—Filed