FIELD: ship-building; treatment of holes in ship's foundations used for installation of items of shipboard machinery and equipment. SUBSTANCE: method consists in drilling the datum hole in foundation. Axial lines are made on foundation according to axial lines of machinery and mould 7 is secured on foundation by means of U-clamps 5 and 6. Jig plates are received by holes in mould, after which U-clamps 6, retainer and mould together with jig plates are removed and centering pins 3 are inserted in holes drilled in foundation beforehand. Jig bushes 1 located in longitudinal cuts of cross-members 2 are fitted on pins 3. EFFECT: enhanced reliability. 3 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD AND DEVICE FOR TREATMENT OF HOLES IN SHIP'S FOUNDATIONS | 1993 |
|
RU2076019C1 |
INSERTION PIPE AND METHOD OF ERECTION OF PIPE LINE | 1994 |
|
RU2086846C1 |
METHOD OF LOADING ASSEMBLY UNIT INTO OBJECT | 1996 |
|
RU2117623C1 |
METHOD FOR REMOVING DEFECTIVE SPENT FUEL ASSEMBLIES | 1999 |
|
RU2154864C1 |
METHOD OF AND DEVICE FOR MOUNTING ASSEMBLY UNITS | 1995 |
|
RU2117600C1 |
METHOD TO MANUFACTURE BUILDING REINFORCEMENT STRUCTURES | 2012 |
|
RU2503784C1 |
METHOD OF MOUNTING SHIPBOARD SHAFT LINE | 1991 |
|
RU2031055C1 |
METHOD OF MOUNTING SHIPBOARD SHAFTING | 1994 |
|
RU2092380C1 |
TRANSPORTATION SYSTEM FOR LONGITUDINAL AND TRANSVERSE DISPLACEMENT OF SHIPS | 1996 |
|
RU2107007C1 |
METHOD OF LEVELLING, LAYING-OUT AND CHECKING SHIP'S HULL | 1992 |
|
RU2094294C1 |
Authors
Dates
1997-03-27—Published
1993-05-21—Filed