FIELD: hydroelectric power engineering; hydraulic scheme construction for leveling surface temperature conditions of upstream and downstream ponds of hydroelectric power plant dam. SUBSTANCE: water is selectively sampled from upstream pond of power-plant dam by placing water intake with spillway upstream of turbine penstock; spillway is provided with horizontal shelf, such a floating-shaft type; wave produced above spillway shelf is displaced towards spillway center by reducing atmospheric pressure above spillway in the region where perimeter is higher than that of wave. EFFECT: facilitated procedure. 3 dwg
| Title | Year | Author | Number |
|---|---|---|---|
| VACUUM-OPERATED WATER RECEIVER FOR SELECTIVE TAKING WATER FROM SURFACE LAYERS OF STORAGE | 1994 |
|
RU2093639C1 |
| METHOD TO CONSTRUCT SEISMIC-SAFE HYDRAULIC POWER PLANTS THAT PROTECT RIVERS AND ENVIRONMENT | 2012 |
|
RU2514640C1 |
| SMALL-SIZE HYDROELECTRIC POWER STATION WITH ACTION TURBINE | 2005 |
|
RU2305793C1 |
| HYDRAULIC POWER UNIT WITH DISCHARGE WATER CONDUIT AND SIDE WATER INTAKE | 2008 |
|
RU2448215C2 |
| ACTIVE CONE TURBINE | 2011 |
|
RU2495278C2 |
| DAMLESS HYDRO-ELECTRIC STATION WITH INTERMEDIATE RESERVOIR | 1998 |
|
RU2162914C2 |
| WATER INTAKE FOR TAKING WATER FROM SURFACE LAYERS OF STORAGE BASIN | 0 |
|
SU1700136A1 |
| VERSIONS OF WATER INTAKE FOR OBTAINING WATER FROM SURFACE LAYER OF BASIN | 0 |
|
SU1086060A2 |
| DAMLESS HYDROELECTRIC POWER STATION | 1998 |
|
RU2173745C2 |
| METHOD OF MAINTAINING NATURAL ICE BUILD-UP AND TEMPERATURE CONDITIONS AT HYDRAULIC ENGINEERING SITES | 0 |
|
SU1788138A1 |
Authors
Dates
1997-03-27—Published
1993-01-25—Filed