FIELD: mining. SUBSTANCE: on developing sides up to the intermediate bottom of the open pit after the changed outline, the wells are drilled and blasted up to the depth ensuring its excavation beyond limits of the design bottom. EFFECT: higher productivity. 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR WINNING MINERALS IN QUARRY SIDE | 1996 |
|
RU2114994C1 |
SELECTING WORKING OF UNWORKED EDGE OF UPLAND MINERAL DEPOSIT QUARRY WORKING ZONE | 2013 |
|
RU2521987C1 |
METHOD OF MINERALS QUARRY MINING | 2008 |
|
RU2378512C1 |
DEVELOPMENT METHOD OF MINERAL RESOURCES BY SPIRAL PIT | 2010 |
|
RU2435032C1 |
METHOD FOR EXTRACTION OF BY-SLOPE MINERALS | 1994 |
|
RU2054120C1 |
METHOD OF EXTRACTION OF MINERALS FROM OPEN-PIT FLANKS | 1995 |
|
RU2100608C1 |
METHOD OF MINERALS QUARRY MINING | 2008 |
|
RU2378513C1 |
METHOD OF EXTRACTING UNDEREXPLORED MINERAL FROM FLANKS OF OPENCAST | 1997 |
|
RU2122118C1 |
METHOD FOR CLOSELY LOCATED ORE BODIES CUTTING WITH SEPARATE PITS | 2005 |
|
RU2294433C1 |
METHOD OF OPENCAST RECONSTRUCTION | 0 |
|
SU1710754A1 |
Authors
Dates
1997-04-20—Published
1994-04-04—Filed