FIELD: opencast mining of mineral deposits. SUBSTANCE: formed on contour of mineral occurrence in flank of opencast by two branches is section of road slip to opencast, and final exploration of mineral is carried out from elevations of its profile. Then slip branches are combined, road slip is reformed and final contours of working are formed. Analytic dependence of determination of elevation of point of joining of road slip branches is offered. EFFECT: higher efficiency of extraction due to reduced volumes and terms of performance of stripping operations by completion of exploration of minerals in the course of mining and rational contours of their extraction. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF EXTRACTION OF MINERALS FROM OPEN-PIT FLANKS | 1995 |
|
RU2100608C1 |
METHOD OF MINERAL EXTRACTION FROM FLANKS OF OPENCAST | 1995 |
|
RU2087716C1 |
METHOD OF MINERALS QUARRY MINING | 2008 |
|
RU2378512C1 |
METHOD OF MINERALS QUARRY MINING | 2008 |
|
RU2378513C1 |
METHOD FOR WINNING MINERALS IN QUARRY SIDE | 1996 |
|
RU2114994C1 |
METHOD OF OPENCAST RECONSTRUCTION | 0 |
|
SU1710754A1 |
DEVELOPMENT METHOD OF MINERAL RESOURCES BY SPIRAL PIT | 2010 |
|
RU2435032C1 |
METHOD FOR EXTRACTION OF BY-SLOPE MINERALS | 1994 |
|
RU2054120C1 |
PROCESS OF STRIP MINING OF DEPOSITS | 1993 |
|
RU2057937C1 |
METHOD FOR RECONSTRUCTING QUARRY WITH TWO PROXIMATE ORE BODIES | 2002 |
|
RU2230192C1 |
Authors
Dates
1998-11-20—Published
1997-06-20—Filed