FIELD: hydromechanization. SUBSTANCE: method comes to transportation of water-soil mixture (slurry) along pipeline 2 to turnable bridge installed in stores and equipped with slurry thickener 8 with turnable branch pipe 9. First thickened slurry is placed over maximum diameter of stores thus forming outer banking and then inner banking is formed by turning branch pipe 9. Space between banking walls is filled with slurry by moving bridge 3. Water from thickener is let out along return pipeline 11. EFFECT: facilitated storing of slurry. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF BUILDING EARTHEN STRUCTURES BY HYDRAULIC DEPOSITION OF SOIL | 1996 |
|
RU2078172C1 |
PROCESS OF HYDRAULIC DEPOSITION OF GROUND FACILITIES | 2000 |
|
RU2202677C2 |
HYDRAULIC MIXTURE THICKENER | 2000 |
|
RU2185245C1 |
METHOD OF HYDRAULIC DEPOSITION OF SOIL ON UNCOVERED SECTIONS OF OIL-AND-GAS PIPELINE | 1996 |
|
RU2078016C1 |
METHOD OF HEAP LIXIVIATION | 1995 |
|
RU2095562C1 |
HYDRAULIC HANDLER | 0 |
|
SU906875A1 |
DEVICE FOR FORECASTING OF RESIDUAL RESOURCE AT NONDESTRUCTIVE CONTROL; DETERMINATION OF SERIOUS POTENTIALLY DANGEROUS DEFECTS; IDENTIFICATION OF ZONES OF BRITTLE DAMAGE; DEFINITION OF CHANGE IN ZONES OF PHASE STRUCTURE | 2012 |
|
RU2511074C2 |
Authors
Dates
1997-04-27—Published
1996-05-28—Filed