FIELD: systems of hydraulic transport; recovery and processing of sand and gravel materials. SUBSTANCE: thickener has hydraulic cyclone located horizontally on self-propelled chassis, loading, distributing and return pipe lines. Return pipe line is fitted hydraulic mixture flow control unit equipment with systems of gates; distributing pipe line is provided with several discharge openings made in form of cuts in pipe line body and provided with gates whose shape corresponds to shape of cuts and their curvature corresponds to curvature of distributing pipe line. Hydraulic cyclone and stating section of return pipe line are mounted at horizontal position of their axes; hydraulic mixture flow control unit is connected with loading pipe line. EFFECT: reduced hydraulic resistance in units; enhanced control of hydraulic mixture flow and increased productivity of thickener. 2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCESS OF HYDRAULIC DEPOSITION OF GROUND FACILITIES | 2000 |
|
RU2202677C2 |
METHOD OF BUILDING EARTHEN STRUCTURES BY HYDRAULIC DEPOSITION OF SOIL | 1996 |
|
RU2078172C1 |
METHOD OF KEEPING IN STORAGE SOIL AND SAND MATERIALS | 1996 |
|
RU2078013C1 |
METHOD OF HYDRAULIC DEPOSITION OF SOIL ON UNCOVERED SECTIONS OF OIL-AND-GAS PIPELINE | 1996 |
|
RU2078016C1 |
HYDRAULIC HANDLER | 0 |
|
SU906875A1 |
PROCESS COMPLEX FOR UNLOADING AND CARRYING SAND-GRAVEL MIX TO SAND-GRAVEL CLASSIFICATION CIRCUIT WITH SEPARATION OF GRADED SAND AND GRAVEL | 2009 |
|
RU2432312C2 |
METHOD FOR FILLING GROUND STRUCTURES IN WINTER | 2000 |
|
RU2179215C1 |
METHOD OF HEAP LIXIVIATION | 1995 |
|
RU2095562C1 |
COMPLEX OF MOULDING SAND ENRICHMENT BY HYDRAULIC ATTRITIONING WITH SUBSEQUENT GRADING AND DRY SCREENING | 2008 |
|
RU2403979C2 |
METHOD OF CONDUCTING MASS-TRANSFER PROCESSES AND APPARATUS THEREFOR | 2014 |
|
RU2558594C1 |
Authors
Dates
2002-07-20—Published
2000-12-22—Filed