FIELD: hydromechanization. SUBSTANCE: method comes to laying a filling pipeline in parallel with pipeline to be covered and delivering into filling zone. Turnable distributing pipe is installed on end section of filling pipe. Distributing pipe is arranged initially along section of pipeline to be covered and support platform is formed by delivering slurry. Then distributing pipe is placed square to section of pipeline to be covered and protective layer of soil is formed on uncovered section of pipeline. EFFECT: facilitated covering of exposed sections of pipelines. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF BUILDING EARTHEN STRUCTURES BY HYDRAULIC DEPOSITION OF SOIL | 1996 |
|
RU2078172C1 |
PROCESS OF HYDRAULIC DEPOSITION OF GROUND FACILITIES | 2000 |
|
RU2202677C2 |
HYDRAULIC MIXTURE THICKENER | 2000 |
|
RU2185245C1 |
METHOD OF KEEPING IN STORAGE SOIL AND SAND MATERIALS | 1996 |
|
RU2078013C1 |
METHOD FOR FILLING GROUND STRUCTURES IN WINTER | 2000 |
|
RU2179215C1 |
MINELAYER | 2007 |
|
RU2339896C1 |
Authors
Dates
1997-04-27—Published
1996-05-28—Filed