FIELD: construction of structures by filling; construction of roads and drilling sites at subzero temperatures. SUBSTANCE: method involves ground excavation in reservoir, transportation of sand-water mixture by means of suction dredge through lanes formed in ice over pipeline, and layer-by-layer placement of ground on building site at sub-zero ambient temperatures; serial rows of holes are made for example by drilling holes on building site. Then holes are filled with sand-water mixture which is condensed to form supporting sand piles; layer-by-layer placement of ground is effected on site consolidated by sand piles, thickness of layers is maximum 10 cm. After placing each layer of ground the latter is dewatered by natural freezing of hydraulic mixture keeping certain time intervals between layer placing. EFFECT: reduced labor consumption and enhanced reliability due to reduced time for erecting and subsidence probability upon thawing. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF SEWAGE HEADER CLEANING | 2000 |
|
RU2181419C1 |
PROCESS OF HYDRAULIC DEPOSITION OF GROUND FACILITIES | 2000 |
|
RU2202677C2 |
HYDRAULIC FILL RE-LAYING METHOD | 2017 |
|
RU2661950C1 |
METHOD OF HYDRAULIC DEPOSITION OF SOIL ON UNCOVERED SECTIONS OF OIL-AND-GAS PIPELINE | 1996 |
|
RU2078016C1 |
METHOD OF BUILDING EARTHEN STRUCTURES BY HYDRAULIC DEPOSITION OF SOIL | 1996 |
|
RU2078172C1 |
METHOD FOR ALTERNATELY-TWO-SIDED RECLAMATION OF STACK OF NONMETALLIC BUILDING MATERIALS | 2020 |
|
RU2755064C1 |
HYDRAULIC MIXTURE THICKENER | 2000 |
|
RU2185245C1 |
METHOD OF CONSOLIDATING THE SURFACE OF EARTH-FILL STRUCTURE | 0 |
|
SU1016416A1 |
METHOD OF KEEPING IN STORAGE SOIL AND SAND MATERIALS | 1996 |
|
RU2078013C1 |
METHOD FOR BUILDING EARTHWORK ON PEAT | 0 |
|
SU1715916A1 |
Authors
Dates
2002-02-10—Published
2000-12-15—Filed