FIELD: hydraulic engineering. SUBSTANCE: stubborn members in the form of long members 5 are installed on dam side situated downstream from earth dam with concrete core 5. One end of long members rests on core 5 through support members 10, and separated from it by vertical slide seams. Another ends rest on lower prism 2 through support members 12. Long members 9 are one-part members or many-part and installed by tiers over dam height. Support members 10 intersect cross seams of core 5. Support members 10 and 12 of long members 9 are integrated into frames. Frames are arranged as one raw of upper tier over dam width, and as two raws of upper tier. EFFECT: higher reliability. 4 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
EARTH DAM WITH FROZEN GROUND CURTAIN IN ITS BODY AND BASE | 1996 |
|
RU2153555C2 |
DAM MADE OF LOCALLY AVAILABLE MATERIALS | 0 |
|
SU968151A1 |
EARTH DAM | 2013 |
|
RU2550885C2 |
STONE-EARTH FILL DAM WITH FREEZING UPPER PART | 1993 |
|
RU2071524C1 |
DAM | 1997 |
|
RU2123556C1 |
ANTISEEPAGE DIAPHRAGM OF EARTH DAM AND METHOD OF ITS CONSTRUCTION | 0 |
|
SU1661267A1 |
METHOD OF EARTH DAM CONSTRUCTION | 1998 |
|
RU2145372C1 |
METHOD FOR ERECTING EARTHFILL DAM | 2000 |
|
RU2180934C2 |
EARTH-FILL EARTHQUAKE-RESISTANT DAM | 1991 |
|
RU2010087C1 |
GROUND DAM | 2002 |
|
RU2226588C2 |
Authors
Dates
1997-06-10—Published
1994-03-05—Filed