FIELD: mining industry. SUBSTANCE: for control of rock pressure at mine field boundary in edging part of displacement sincline, mining of ore is effected by alternating long and short chambers. If extraction drift is located perpendicularly to mine field boundary, length of short chambers is increased as their location is moving towards boundary of edging part of displacement sincline closer to complete extraction zone. If positioning of extraction drift is parallel to mine field boundary, short chambers extend to boundary of stepped relieving zone. EFFECT: high efficiency. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MINING FLAT SEAMS AT ROOF CONTROL ON BAND PILLARS | 1994 |
|
RU2074959C1 |
METHOD FOR SECONDARY TREATMENT OF SALT BED | 2011 |
|
RU2468206C1 |
METHOD FOR MINING OF GENTLY SLOPING POTASH SALT BEDS | 1993 |
|
RU2054546C1 |
METHOD OF ROOF CONTROL IN FLAT POTASSIUM SEAMS | 1994 |
|
RU2074960C1 |
METHOD FOR WORKING STARTA OF GENTLY SLOPING AND CLOSE FORMATIONS OF WATER-SOLUBLE MINERALS | 0 |
|
SU1038481A1 |
METHOD FOR REDUCING DEFORMATION OF WATER-PROTECTIVE MASS AND GROUND SURFACE | 1996 |
|
RU2118455C1 |
METHOD FOR MINING THICK SALT OUTBURST-PRONE SEAMS WITH COMPLICATED HYPSOMETRY OF THEIR OCCURRENCE | 1991 |
|
RU2015329C1 |
METHOD FOR BEDDED DEPOSIT DEVELOPMENT WITH HEADING-AND-STALL METHOD | 2005 |
|
RU2303132C1 |
METHOD FOR DEVELOPMENT OF FLAT POTASSIUM SEAMS IN CHAMBERS | 1995 |
|
RU2083828C1 |
METHOD FOR PREPARATION OF EXCAVATION SITE AT CHAMBER DEVELOPMENT SYSTEM | 2015 |
|
RU2577570C1 |
Authors
Dates
1997-06-10—Published
1995-01-27—Filed