FIELD: mining industry. SUBSTANCE: according to method, firstly dimensions are determined of mining sections in compliance with permissible shear stresses in depth of rock matter being excavated. Mining chambers are cut from hauling entry located in parallel to axis of supporting pillar. Mining section can be worked out by non-parallel chambers with formation of pillars which are trapezoidal in plan. EFFECT: high efficiency. 2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR MINING OF GENTLY DIPPING POTASSIUM BEDS WITH THIN WATER-PROTECTION MASS | 1995 |
|
RU2098625C1 |
METHOD OF MINING FLAT SEAMS AT ROOF CONTROL ON BAND PILLARS | 1994 |
|
RU2074959C1 |
METHOD FOR DEVELOPMENT OF ADJACENT FLAT POTASSIUM SEAMS BY NON-COAXIAL CHAMBERS | 1995 |
|
RU2083829C1 |
METHOD OF ROOF CONTROL IN FLAT POTASSIUM SEAMS | 1994 |
|
RU2074960C1 |
METHOD FOR CONTROL OF ROCK PRESSURE | 1995 |
|
RU2081316C1 |
METHOD FOR CONTROL OF SINKING OF WORKED ROCK AT CHAMBER DEVELOPMENT OF FLAT-LYING POTASSIUM SEAMS | 1996 |
|
RU2103506C1 |
STRIP ROOM METHOD OF EXPLOITATION OF POTASSIUM GENTLE-SLOPE BEDS WITH STOWING | 1992 |
|
RU2038477C1 |
METHOD FOR MINING THICK SEAMS OF POTASSIUM-MAGNESIUM SALTS | 1996 |
|
RU2110687C1 |
METHOD FOR CONTROL OF ROCK PRESSURE AT CHAMBER DEVELOPMENT OF FLAT-LYING POTASSIUM SEAMS | 1996 |
|
RU2103505C1 |
METHOD OF HYDRAULIC LAYING OF WORKED SPACE IN MINING COAL BEDS | 0 |
|
SU1763661A1 |
Authors
Dates
1997-07-10—Published
1995-03-06—Filed