FIELD: mining and construction industry. SUBSTANCE: method can be used in dumping earth and rock at opencast mining of mineral deposits and also at filling construction sites. According to method primary fills are formed with hollows in longitudinal slopes and covering them with additional prisms of earth adjacent to hollows. Then, earth and rock of each additional prism and of slope adjacent mass is displaced into hollow longitudinally and laterally. Formed on hollow sections are unloading sites for filling them with road covering materials. Given in description is analytical dependence for determining volumes of rock and earth being displaced. EFFECT: high efficiency. 4 dwg
Title | Year | Author | Number |
---|---|---|---|
DUMP FILLING METHOD | 1995 |
|
RU2083837C1 |
METHOD FOR FORMATION OF DUMP | 1995 |
|
RU2079658C1 |
ROCK HEAP SPILLING METHOD | 0 |
|
SU1682573A1 |
METHOD OF MINERALS QUARRY MINING | 2008 |
|
RU2378512C1 |
PROCESS OF FORMATION OF DUMPS | 0 |
|
SU1813878A1 |
METHOD OF MINERAL EXTRACTION FROM FLANKS OF OPENCAST | 1995 |
|
RU2087716C1 |
METHOD OF EXTRACTION OF MINERALS FROM OPEN-PIT FLANKS | 1995 |
|
RU2100608C1 |
METHOD OF MINERALS QUARRY MINING | 2008 |
|
RU2378513C1 |
PROCESS OF FORMATION OF DISPOSAL AREA FOR ROCKS | 0 |
|
SU1803556A1 |
METHOD FOR HANDLING OVERBURDEN EARTH | 1995 |
|
RU2106494C1 |
Authors
Dates
1997-06-10—Published
1995-07-13—Filed