FIELD: mining and construction engineering. SUBSTANCE: method can be used in building piles and construction sites. According to method, advancing embankments are formed in direction from quarry towards increasing elevation marks of existing departure and by displacement of their ground mass, formed are new departures over sections of thalvegs and slopes over it with angles less than angles of repose. Then, alternately ravines, departure and space between departures are filled with ground in section in same direction. EFFECT: high efficiency. 5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR FORMATION OF DUMP | 1995 |
|
RU2079658C1 |
METHOD OF FORMING DESCENT FROM DUMP | 1995 |
|
RU2081322C1 |
PROCESS OF FORMATION OF DISPOSAL AREA FOR ROCKS | 0 |
|
SU1803556A1 |
ROCK HEAP SPILLING METHOD | 0 |
|
SU1682573A1 |
PROCESS OF FORMATION OF DUMPS | 0 |
|
SU1813878A1 |
METHOD OF EXTRACTING UNDEREXPLORED MINERAL FROM FLANKS OF OPENCAST | 1997 |
|
RU2122118C1 |
METHOD OF EXTRACTION OF MINERALS FROM OPEN-PIT FLANKS | 1995 |
|
RU2100608C1 |
METHOD FOR HANDLING OVERBURDEN EARTH | 1995 |
|
RU2106494C1 |
METHOD FOR FORMATION OF EXTERNAL DUMP IN MINERAL OPENCAST MINING | 1990 |
|
RU2009320C1 |
METHOD FOR EXTRACTION OF BY-SLOPE MINERALS | 1994 |
|
RU2054120C1 |
Authors
Dates
1997-07-10—Published
1995-08-16—Filed