FIELD: mining and construction industries; applicable in mineral opencast mining for dump formation and filling the territories of industrial and civil engineering. SUBSTANCE: leading embankment is formed by pioneer embankments over the contours of slip road and its branches and formation is completed by transverse sections, and slip road and its branches are filled by sections from the distant to close ones with respect to open pit. Analytic relation for determination of volume of pioneer embankment is offered. EFFECT: higher efficiency. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF FORMING DESCENT FROM DUMP | 1995 |
|
RU2081322C1 |
DUMP FILLING METHOD | 1995 |
|
RU2083837C1 |
METHOD FOR FORMATION OF EXTERNAL DUMP IN MINERAL OPENCAST MINING | 1990 |
|
RU2009320C1 |
METHOD OF DUMPING OVERBURDEN ROCK IN FLOODED CONDITIONS | 0 |
|
SU1700237A1 |
METHOD FOR CLOSELY LOCATED ORE BODIES CUTTING WITH SEPARATE PITS | 2005 |
|
RU2294433C1 |
ROCK HEAP SPILLING METHOD | 0 |
|
SU1682573A1 |
METHOD OF OPEN MINING OF STEEP OBLONG DEPOSITS | 2011 |
|
RU2490462C2 |
METHOD FOR STORING OVERBURDEN IN BURROW CUT | 2017 |
|
RU2652038C1 |
METHOD OF OPENCAST MINING OF STEEPLY DIPPING STRETCHED DEPOSITS | 1999 |
|
RU2167297C2 |
METHOD OF EXTRACTION OF MINERALS FROM OPEN-PIT FLANKS | 1995 |
|
RU2100608C1 |
Authors
Dates
1997-05-20—Published
1995-08-16—Filed